Abraj Al AzlContracting
Call العربية
Empty seaside pool during waterproofing

Pool waterproofing in As Sunaidah District

Water stays in the pool

Waterproofing for concrete pool shells from the inside, before and after tiling

+966 54 311 2066
The service in your area

Pool waterproofing in As Sunaidah District

Pool waterproofing in As Sunaidah District starts with WhatsApp messages containing photos of the pool from different angles. The area has residential villas and apartment buildings, many with pools whose concrete walls need leak protection.

As Sunaidah District has a mix of villas and residential buildings on plots of varying sizes, with many private pools. Pools here are typically concrete and of different ages, facing both water pressure and heat. Cracks and leaks may start at joints or under pressure at the pool floor, and humidity from the air and coast worsens the issue. Photos help identify weak points accurately before waterproofing is applied.

  • As Sunaidah District is an area in Al Ahsa, Eastern Province, near Munifah District, Ar Rafiah District and Al Marbidia District, with villas and residential buildings.
  • A pool floor bears constant water pressure, and small cracks or seepage spots may appear after years of use.
What the service includes

What we do for you in As Sunaidah District

  • Applying the layer that suits the condition of the surface
  • Leaving the layer to cure before refilling or tiling
  • Checking the shell walls, floor and corners
  • Treating cracks, joints and fitting openings
How we work

The steps of pool waterproofing in As Sunaidah District

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.

2

Inspect the shell and locate the points

The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.

3

Prepare the surface and treat the cracks

The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.

4

Apply the layer and let it cure

The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.

What sets us apart

Why Abraj Al Azl?

Water finds no way through the shellA continuous layer closes the cracks, the openings and the joints together, so the water has no path through the shell after treatment.

Start from As Sunaidah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

As Sunaidah District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Two workers in high-visibility vests insulating a roof beside the AC units
Round water tank lined in blue inside, with a float in the middle

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing in As Sunaidah District

Can a leak from the pool floor be treated without emptying it completely?

It depends on how much is leaking. Light seepage may be treated from above while water remains, but heavy leaks need full or near-complete draining to ensure waterproofing quality.

Do you pay special attention to pool joints and corners during waterproofing?

Yes, joints and corners are sensitive areas needing careful treatment. We seal these regions first, then work on the rest of the surface. Photos show the details of your situation before work begins.

Which points in a pool shell leak most often?

The corners between the walls and the floor, the tile joints, the openings around the light fittings, the return fittings and the drains, and the skimmer connection. These points move more than the middle of the wall and open up under the water pressure and the changes in temperature.

What decides the cost of waterproofing a pool?

The area of the shell and the size of the pool, the condition of the concrete and how many cracks there are, whether the work is before or after tiling, the material that suits the case, and how easily the site can be reached. Send photos of the pool and rough dimensions on WhatsApp and we will suggest the right treatment.

Does the waterproofing method change with the shape and depth of the pool?

Yes. Pools with many corners or irregular shapes need more care at the bends because stresses concentrate there. The depth also affects the pressure the waterproof layer must carry. A liquid membrane forms easily at these points, while a cementitious coating needs careful preparation at the corners. Photos help us decide the right treatment for each shape.

Do you offer pool waterproofing in As Sunaidah District?

Yes. As Sunaidah District is within our service area in the Eastern Province, and we also work in Munifah District, Ar Rafiah District and Al Marbidia District. Call us or send photos of the spot on WhatsApp.

Nearby areas

Areas near As Sunaidah District

If the site is outside As Sunaidah District, the same service is available in Munifah District, Ar Rafiah District and Al Marbidia District.

Other services in the area

More services in As Sunaidah District

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in As Sunaidah District
and we will plan the next step with you

Call us or send photos of the pool and the points you suspect on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp