
Pool waterproofing after tiling in Al Qusaybi
Pool waterproofing after tiling in Al Qusaybi begins with a WhatsApp message with a photo of the basin and damp areas. The village has pools in small residential compounds and hotels, and the photos show cracks, weak joints and where the leak comes from.
Pools in Al Qusaybi are in small residential compounds and small hotels. The basins are usually medium-sized and the tiles may be old or cracked. Leaks appear at joints, corners and around pipe openings, and may come from soil movement beneath or constant water pressure. Some basins have solid foundations and others may be affected by soil moisture and intense heat. The photos show us the basin's nature, the tiles and cracks with precision.
- Al Qusaybi is a village in the Eastern Province, close to Al Hunayy, Khurays and At Tuhaymiyah, with small residential compounds and hotels.
- Intense heat and humidity affect tiles and joints in rural swimming basins.
The main items of pool waterproofing after tiling in Al Qusaybi
- Injecting cracks with a compound suited to the concrete shell
- Testing the leak area with dye and pressure-checking the lines
- Resealing joints with a flexible water-resistant compound
- Closing pump, light and return fittings from inside
This is how we work in Al Qusaybi
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.
Your request from Al Qusaybi comes to usCall or WhatsApp on one number, and we answer you ourselves.
Al Qusaybi is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing after tiling in Al Qusaybi
Can a pool leak in Al Qusaybi be caused by soil and moisture?
Yes, it can. Soil moisture can press on the basin walls from outside and cause a leak. Also, soil movement under the basin can crack the concrete or weaken the joints. Photos from outside show us if there is moisture around the basin on the outside.
Can a simple village pool be repaired without heavy machinery?
Yes, in most cases yes. Repairing joints and surface cracks does not need heavy machinery. Preparation, cleaning and sealing are usually done by hand. But if the basin is collapsed or the concrete is heavily cracked, there may be other needs. The photos tell us what we need.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
Can the pool be used straight after treatment?
No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.
Is Al Qusaybi within your service area?
Yes, Al Qusaybi is one of the areas we work in, as are Al Hunayy, Khurays and At Tuhaymiyah. To start, call us or message us on WhatsApp.
How do I know my pool is leaking and not just evaporating?
Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.
The same service in nearby areas
Nearby areas we also cover: Al Hunayy, Khurays and At Tuhaymiyah.
More services in Al Qusaybi


