
Cementitious pool waterproofing in Al Qusaybi
Cementitious pool waterproofing in Al Qusaybi starts with a photo or call describing the pool and its walls. The village contains villas and small apartment buildings with private pools of varying age and concrete condition. Flexible cement-based lining treats the concrete and protects the tiles and joints from leaks and damp.
Al Qusaybi has pools in villa and apartment building yards, some older and some newer. Older pools typically show cracks in the concrete floor and walls and water seeping from joints and corners, while newer ones may only need their lining refreshed. Intense summer heat and inland dryness stress exposed concrete, and photos clearly show tile condition and cracks before the lining method is chosen.
- Al Qusaybi is a village in the Eastern Province near Al Hunayy, Khurays and At Tuhaymiyah, containing villas and small buildings.
- A villa's concrete pool faces a daily cycle of heat and moisture, so the lining must withstand both stresses together.
What we do for you in Al Qusaybi
- Closing return pipe openings and drain outlets before the coating goes on
- Checking the pool walls and floor and locating cracks and openings
- Applying the flexible cementitious layer over the whole shell
- Wet curing after application so the coating sets correctly
The stages of the work in Al Qusaybi
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
Al Qusaybi is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Your request from Al Qusaybi comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Qusaybi
Can an old pool be waterproofed without draining it completely?
It depends on the cracks and leakage severity. The photos will show whether the leak is minor or acute, and we will tell you if work is possible with overflow water or complete draining is needed.
Does old tile stay in place after pool waterproofing?
If the tile is well bonded, yes, but the new lining may require regrouting joints or replacing some tiles. The photos show the tile condition before we decide with you what is needed.
What decides the cost of cementitious pool waterproofing?
The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
Is Al Qusaybi within your service area?
Yes, Al Qusaybi is one of the areas we work in, as are Al Hunayy, Khurays and At Tuhaymiyah. To start, call us or message us on WhatsApp.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
We also offer it in neighbouring areas
Nearby areas we also cover: Al Hunayy, Khurays and At Tuhaymiyah.
More services in Al Qusaybi

