
Pool waterproofing after tiling in Al Majidiyah
Pool waterproofing after tiling in Al Majidiyah starts with a photo of the pool and where it leaks, sent by call or WhatsApp. The district has villas and residential buildings of various sizes, many with a private tiled pool that needs treatment when leaks appear.
Al Majidiyah mixes newly built villas with older ones, so pool tiling and joints vary in quality. A newer tiled pool may leak at the grout or around pipes if these were not sealed during construction, whilst an older pool may have deeper and wider cracks. Moisture under the tiles weakens the mortar over time and can reach the soil beneath the pool. Photos pinpoint the leak before treatment is chosen.
- Al Majidiyah is a district in the Eastern Province, close to the Warehouse Area, Al Aqiq and Al Khamisah, with villas and residential buildings.
- An open tiled pool is exposed to strong sunlight and daily temperature swings, so cracks widen and grout joints shift.
The pool waterproofing after tiling work in Al Majidiyah
- Injecting cracks with a compound suited to the concrete shell
- Lifting damaged tiles and rebuilding the layer behind them where needed
- Closing pump, light and return fittings from inside
- Resealing joints with a flexible water-resistant compound
The stages of the work in Al Majidiyah
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.
Your request from Al Majidiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from Al Majidiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about pool waterproofing after tiling in Al Majidiyah
How do you locate the leak in a tiled pool?
You send us a clear photo of the suspected area or any dampness around the pool. We identify from the photos and description whether the leak is in the grout, cracks or around pipes, and may ask for additional photos from different angles.
Does treating a leak require removing the tiles?
Not always. If the leak is in the grout or surface cracks, we treat it without removing the tiles. But if the leak is deep under the tiles, we may need to lift tiles in the affected area to address the underlying cause.
Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?
In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.
Is Al Majidiyah within your service area?
Yes, Al Majidiyah is one of the areas we work in, as are Warehouse Area, Al Aqiq (near Inak) and Al Khamisah. To start, call us or message us on WhatsApp.
What decides the cost of waterproofing a pool after tiling?
The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
Areas near Al Majidiyah
Nearby areas we also cover: Warehouse Area, Al Aqiq (near Inak) and Al Khamisah.
More services in Al Majidiyah

