Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Al Aziziyah First District

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Al Aziziyah First District

Pool waterproofing after tiling in Al Aziziyah First District starts with photos of the pool sent by call or WhatsApp. The district has modern villas and residential buildings, many with private tiled pools. Photos pinpoint where the leak is before repair method is chosen.

Tiled pools in villas and homes need careful treatment, as water leaks through joints between tiles or tiny cracks beneath them. Photos show whether the leak is from the pool floor or walls, and then joints, cracks and fittings are sealed to stop the water. Heat and humidity can speed the breakdown of grout between tiles, making treatment necessary for years of safe use.

  • Al Aziziyah First District is a residential district in the Eastern Province, next to Al Hamra First District and Government Departments Complex Second District, with modern villas and buildings.
  • The joints between pool tiles are the main paths for leaks, and repairing them directly affects the pool's stability.
What the service includes

The scope of the work in Al Aziziyah First District

  • Resealing joints with a flexible water-resistant compound
  • Injecting cracks with a compound suited to the concrete shell
  • Watching the water level after filling to confirm the leak is closed
  • Testing the leak area with dye and pressure-checking the lines
How we work

This is how we work in Al Aziziyah First District

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

Start from Al Aziziyah First District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Aziziyah First District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Aziziyah First District

How is the leak source found in a tiled pool in Al Aziziyah?

We ask for clear photos of the pool inside and outside, and any signs of dampness or staining around it. These photos show us exactly where the water is leaking, and then we choose the right repair method.

Can the pool be repaired without draining it?

It depends on where the leak is and how deep. If the leak is only in surface joints we may work without full drainage, but the photos will make that clear.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

What is the difference between resealing joints and injecting cracks in a pool?

A joint is the line between two tiles or between a tile and a fitting, and it is resealed with a flexible water-resistant compound that tolerates shell movement. A crack is a break in the concrete or render behind the tile, and it is injected with a compound that fills the void and stops it spreading. The source determines which treatment is used.

How do I request pool waterproofing after tiling in Al Aziziyah First District?

Call us, or send clear photos of the spot and its location in Al Aziziyah First District on WhatsApp, and we will work out the next step with you.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Nearby areas

Areas near Al Aziziyah First District

Nearby areas we also cover: Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District.

Other services in the area

More services in Al Aziziyah First District

Pool at night with water jets after waterproofing

Your first step in Al Aziziyah First District:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp