Abraj Al AzlContracting
Call العربية
Empty seaside pool during waterproofing

Pool waterproofing in Al Aziziyah First District

Water stays in the pool

Waterproofing for concrete pool shells from the inside, before and after tiling

+966 54 311 2066
The service in your area

Pool waterproofing in Al Aziziyah First District

Pool waterproofing in Al Aziziyah First District starts with photos of the pool's interior and exterior sent by call or WhatsApp. The district has villas and apartment buildings with private pools in their yards or on roofs, and each pool needs a waterproofing approach suited to its age and materials.

Pools in Al Aziziyah First District range from older ones in established villas and buildings to newer installations in modern homes. Older concrete often shows cracks and damp around joints and corners, especially if regular maintenance has been light. Newer pools may need their existing lining inspected or renewed before retiling. The photos you send reveal the surface condition, cracks and any dampness, which determines the right waterproofing method for your pool.

  • Al Aziziyah First District is a residential district in the Eastern Province, near Al Hamra First District and An Nayfiyah District, with varied villas and apartment buildings.
  • Pools in villas and apartment buildings face constant sun and continuous water pressure, so the waterproofing must withstand both stresses together.
What the service includes

The scope of the work in Al Aziziyah First District

  • Treating cracks, joints and fitting openings
  • Applying the layer that suits the condition of the surface
  • Working before or after tiling depending on the condition of the pool
  • Closing the waterproofing around the skimmer, drains and light fittings
How we work

How we carry out pool waterproofing in Al Aziziyah First District

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.

2

Inspect the shell and locate the points

The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.

3

Prepare the surface and treat the cracks

The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.

4

Apply the layer and let it cure

The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.

What sets us apart

Why Abraj Al Azl?

Water finds no way through the shellA continuous layer closes the cracks, the openings and the joints together, so the water has no path through the shell after treatment.

Al Aziziyah First District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Aziziyah First District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Two workers in high-visibility vests insulating a roof beside the AC units
Round water tank lined in blue inside, with a float in the middle

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing in Al Aziziyah First District

Can an older pool be waterproofed before retiling?

Yes, this is the ideal time. Cracks and joints in the concrete are repaired first, then waterproofing is applied before the new tiles go on. Photos show whether the concrete is sound enough for this approach.

What about rooftop pools in Al Aziziyah First District?

Rooftop pools need special care because heat stresses the slab from below and water from above. Send photos of the pool and tell us its age and any visible problems so we can choose the right method.

Do you cover Al Aziziyah First District?

Yes. We serve Al Aziziyah First District and nearby areas such as Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How do I know the pool is losing water through a leak and not evaporation?

Close the pool and stop the filtration system for a period and mark the water level. If the level falls more than the heat and the wind can explain, there is a leak. You can also check whether the soil around the pool stays wet. Send us photos and a description of what you notice on WhatsApp and we will help you read it.

Which points in a pool shell leak most often?

The corners between the walls and the floor, the tile joints, the openings around the light fittings, the return fittings and the drains, and the skimmer connection. These points move more than the middle of the wall and open up under the water pressure and the changes in temperature.

What decides the cost of waterproofing a pool?

The area of the shell and the size of the pool, the condition of the concrete and how many cracks there are, whether the work is before or after tiling, the material that suits the case, and how easily the site can be reached. Send photos of the pool and rough dimensions on WhatsApp and we will suggest the right treatment.

Nearby areas

The same service in nearby areas

We also work near Al Aziziyah First District, in Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District.

Other services in the area

More services in Al Aziziyah First District

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Al Aziziyah First District
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp