Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Haradh

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Haradh

Cementitious pool waterproofing in Haradh starts with photos of the pool walls and floor, sent by call or WhatsApp. Pools in the town are found mainly at villas and larger homes, and the coating depends on the concrete and how firmly the tiles hold.

Haradh is a town of medium-sized homes and villas, and its pools are usually in rear courtyards. The tiles endure daytime heat and night-time cold, and that swing stresses the concrete over time. Fine cracks mostly appear at corners, so those points are checked in the photos first before the coating type is chosen.

  • Haradh is a town in the Eastern Province, near Ar Rafiah and Jarudiyah, made up of medium-sized homes and villas.
  • The gap between daytime heat and night-time cold puts ongoing pressure on concrete, so flexibility remains important.
What the service includes

The main items of cementitious pool waterproofing in Haradh

  • Wet curing after application so the coating sets correctly
  • Checking the pool walls and floor and locating cracks and openings
  • Applying the flexible cementitious layer over the whole shell
  • Cleaning the concrete surface and removing any adhesive residue or dust
How we work

From first contact to the finished job in Haradh

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

We serve Haradh and around itIncluding Ash Shuruq (near Al Khunn), Al Ekhaa and Ar Rabie (near Al Khunn), as part of our work across the Eastern Province.

Cementitious pool waterproofing in HaradhWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in Haradh

Why do cracks appear at pool corners in Haradh?

Movement in concrete concentrates at corners through expansion and contraction, so cracks show there first. These points are treated before coating, and the photos reveal how wide they are.

Do you serve larger villas with pools in Haradh?

Yes, we serve Haradh. Send photos of the pool and its walls, and tell us about its size and position in the yard so we can choose the suitable method.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Do you cover Haradh?

Yes. We serve Haradh and nearby areas such as Ash Shuruq (near Al Khunn), Al Ekhaa and Ar Rabie (near Al Khunn), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Haradh

Nearby areas we also cover: Ash Shuruq (near Al Khunn), Al Ekhaa and Ar Rabie (near Al Khunn).

Other services in the area

More services in Haradh

Empty seaside pool during waterproofing

Cementitious pool waterproofing in Haradh?
Call us now

Call us or send photos of the pool walls and floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp