
Cementitious pool waterproofing in Ar Rabie (near Al Khunn)
Cementitious pool waterproofing in Ar Rabie begins with photos sent by call or WhatsApp. The area has villas and apartment buildings with private pools on roofs and courtyards, and the cement coating bonds the tiles firmly and protects the concrete from leaks and damp.
Pools in Ar Rabie reflect the range of buildings from old to new, each with its own needs. Older pools may suffer from cracks around joints and tile lift, while newer ones may only need their surface coating refreshed. Intense heat and dryness affect coating durability, and the concrete may need treatment first before recoating. Photo inspection determines whether the work is coating alone or also includes crack and joint repair.
- Ar Rabie is a district in the Eastern Province, near Al Muruj and Ash Shuruq, with villas and apartment buildings.
- Joints between pool tiles are common weak points where water leaks if the coating is not airtight.
What the service covers in Ar Rabie (near Al Khunn)
- Treating hairline cracks and the wall-to-floor junction
- Closing return pipe openings and drain outlets before the coating goes on
- Checking the pool walls and floor and locating cracks and openings
- Applying the flexible cementitious layer over the whole shell
How we carry out cementitious pool waterproofing in Ar Rabie (near Al Khunn)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Your request from Ar Rabie (near Al Khunn) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Ar Rabie (near Al Khunn) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Questions about cementitious pool waterproofing in Ar Rabie (near Al Khunn)
What does cementitious coating do if the tiles are already cracked?
The coating covers the tiles and joints but does not repair cracks in the tiles themselves. If the tiles are badly cracked they may need replacing before coating; the photos show whether.
Must the pool be drained before cement coating is applied?
Yes, the pool must be empty and dry for the coating to be applied properly. The floor and walls must also be cleaned and any old tile or coating debris removed before starting.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
Is Ar Rabie (near Al Khunn) within your service area?
Yes, Ar Rabie (near Al Khunn) is one of the areas we work in, as are Al Muruj (near Al Khunn), Yabrin (near Al Khunn) and Ash Shuruq (near Al Khunn). To start, call us or message us on WhatsApp.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
Cementitious pool waterproofing near Ar Rabie (near Al Khunn)
Nearby areas we also cover: Al Muruj (near Al Khunn), Yabrin (near Al Khunn) and Ash Shuruq (near Al Khunn).
More services in Ar Rabie (near Al Khunn)

