Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Hanidh

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Hanidh

Cementitious pool waterproofing in Hanidh begins with photos of the pool, its tiles and walls, sent by call or WhatsApp. In small villages, family pools are common and face harsh weather that affects both concrete and tiles.

Pools in small villages have simple construction, often made of plain concrete without modern lining. Intense summer heat, moisture, and nearby saltwater accelerate concrete surface degradation and tile deterioration. Joints between tiles, floors and walls widen over time, allowing water to seep behind them. Flexible cementitious coating repairs these joints and strengthens the bond between pool layers; photos show which areas need primary treatment.

  • Hanidh is a village in the Eastern Province, near Al Hulaysiyah and Maghati, with houses and villas on varied plots.
  • Exposed pool tiles face large temperature differences between day and night, causing gradual separation from the concrete beneath.
What the service includes

What we do for you in Hanidh

  • Applying the flexible cementitious layer over the whole shell
  • Checking the pool walls and floor and locating cracks and openings
  • Wet curing after application so the coating sets correctly
  • Treating hairline cracks and the wall-to-floor junction
How we work

The stages of the work in Hanidh

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Hanidh is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Hanidh comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in Hanidh

Can an old pool be repaired with cementitious waterproofing instead of rebuilding in Hanidh?

In most cases yes, if the base concrete is not crumbling. We repair cracks and weak joints then apply the coating; photos will show if damage goes deeper.

Can cementitious waterproofing withstand intense heat and humidity in villages?

Yes, the flexible formula expands and contracts with temperature swings without cracking. It resists coastal salt and humidity, but thorough surface preparation and salt removal are essential for success.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

How does cementitious waterproofing differ from other pool coatings?

Cementitious waterproofing is cement-based with flexible additives; it bonds to concrete and accepts tile adhesive directly on top. Other types such as polyurethane or epoxy have different properties and suit different situations. The choice depends on the concrete condition and whether tiles are going on, which the photos help us work out.

Do you cover Hanidh?

Yes. We serve Hanidh and nearby areas such as Al Hulaysiyah, Maghati and Bakha, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Nearby areas

The same service in nearby areas

If the site is outside Hanidh, the same service is available in Al Hulaysiyah, Maghati and Bakha.

Other services in the area

More services in Hanidh

Empty seaside pool during waterproofing

We start with you in Hanidh
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp