Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Bakha

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Bakha

Cementitious pool waterproofing in Bakha starts with WhatsApp messages including photos and notes on the pool's condition. The hamlet has small buildings, simple villas and farms, and there may be old pools suffering cracks and damp in the hot, dry climate.

Pools in Bakha are often built over many years, and old concrete is prone to fine and deep cracks depending on the original build quality. Tiles may loosen from heat and rare but heavy seasonal moisture. Flexible cementitious coating follows the concrete's movement, protects from leaks and damp, and secures tiles. Send clear initial photos showing damaged areas and cracks so we can assess precisely.

  • Bakha is a small hamlet in the Eastern Province, near Maghati, Hanidh and Al Hulaysiyah, with small buildings, villas and farmland.
  • Pools in rural and farm settings may sit at different ground levels, affecting water drainage around the pool and pressure on the pool walls.
What the service includes

The main items of cementitious pool waterproofing in Bakha

  • Checking the pool walls and floor and locating cracks and openings
  • Closing return pipe openings and drain outlets before the coating goes on
  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Wet curing after application so the coating sets correctly
How we work

The steps of cementitious pool waterproofing in Bakha

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

Bakha is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Bakha with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in Bakha

Does a pool's location affect how it is waterproofed in Bakha?

Yes, if the pool is low water may collect around it, and if it is high the pressure on the walls may differ. Photos show the location and surroundings, and that helps choose the best method.

Can a pool on a Bakha farm be waterproofed without draining it completely?

Most work needs full drainage to reach all cracks and joints and clean the surface. Send initial photos while full so we can see the condition, then we will tell you what is needed.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Do you cover Bakha?

Yes. We serve Bakha and nearby areas such as Maghati, Hanidh and Al Hulaysiyah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

Nearby areas

The same service in nearby areas

We also offer cementitious pool waterproofing in Maghati, Hanidh and Al Hulaysiyah, among the closest areas to Bakha.

Other services in the area

More services in Bakha

Empty seaside pool during waterproofing

Your first step in Bakha:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp