Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Eshbilya

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Eshbilya

Cementitious pool waterproofing in Eshbilya begins with photos of the pool sent by call or WhatsApp. The district has modern villas with private pools, and their concrete needs protection from cracking and leakage.

Eshbilya is a relatively modern district with villas and detached homes on wide plots. Its pools are often newly built, but new concrete is prone to hairline cracks especially at joints and corners. Intense summer heat causes daily expansion and contraction in the structure. Cementitious coating fills these gaps and protects the concrete from the start. Photos show likely crack points and tiles before we choose the method.

  • Eshbilya is a modern district in the Eastern Province near Al Faisaliyah and Al Kawthar, known for villas and detached homes.
  • New concrete pools are prone to expansion and contraction cracks in their first year of use in very hot climates.
What the service includes

What we do for you in Eshbilya

  • Checking the pool walls and floor and locating cracks and openings
  • Treating hairline cracks and the wall-to-floor junction
  • Closing return pipe openings and drain outlets before the coating goes on
  • Applying the flexible cementitious layer over the whole shell
How we work

The stages of the work in Eshbilya

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Eshbilya is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Eshbilya with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in Eshbilya

Should a new pool in Eshbilya be waterproofed before use?

Yes, cementitious coating protects new concrete from cracks that appear due to daily expansion and contraction. It maintains quality and safety long-term. Photos determine the concrete's condition before we apply the coating.

What is the difference between waterproofing a new pool and an old one in Eshbilya?

A new pool needs preventive waterproofing before cracks appear; an older one may need crack and tile repair first. Photos determine the condition and whether prior repairs are needed.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Is Eshbilya within your service area?

Yes, Eshbilya is one of the areas we work in, as are Al Faisaliyah (near Ar Rafiah), Al Kawthar (near Ar Rafiah) and Ghirnatah (near Ar Rafiah). To start, call us or message us on WhatsApp.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Does cementitious waterproofing work for both in-ground and above-ground pools?

Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.

Nearby areas

Cementitious pool waterproofing near Eshbilya

Nearby areas we also cover: Al Faisaliyah (near Ar Rafiah), Al Kawthar (near Ar Rafiah) and Ghirnatah (near Ar Rafiah).

Other services in the area

More services in Eshbilya

Empty seaside pool during waterproofing

We start with you in Eshbilya
with one call

Describe the problem and where it is in Eshbilya, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp