Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Al Faisaliyah (near Ar Rafiah)

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Al Faisaliyah (near Ar Rafiah)

We apply cementitious pool waterproofing in Al Faisaliyah with a flexible cement layer on the walls and floor, protecting the concrete and holding the tiles. Work begins with photos of the pool sent by call or WhatsApp.

Al Faisaliyah is dominated by residential buildings and villas, and its pools range from older to newly built. Older pools sometimes show porous concrete that lets water through, which the photos reveal before application. The concrete must be clean and stable before the coat goes on so that it bonds properly.

  • Al Faisaliyah is a residential district in Hofuf, Al-Ahsa, in the Eastern Province, lying close to Al Andalus.
  • An open pool faces large day-to-night temperature swings, which stress both the coating and the tiles.
What the service includes

What the service covers in Al Faisaliyah (near Ar Rafiah)

  • Applying the flexible cementitious layer over the whole shell
  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Closing return pipe openings and drain outlets before the coating goes on
  • Checking the pool walls and floor and locating cracks and openings
How we work

How we carry out cementitious pool waterproofing in Al Faisaliyah (near Ar Rafiah)

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Cementitious pool waterproofing in Al Faisaliyah (near Ar Rafiah)We choose the method and the materials once we know the condition of the spot.

Al Faisaliyah (near Ar Rafiah) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Faisaliyah (near Ar Rafiah)

How do you know if pool concrete in Al Faisaliyah is ready for coating?

We check the photos for visible cracks, crumbling or porosity and confirm whether the surface is clean and stable. Any clear damage is treated before coating.

Do you work on villa pools in Al Faisaliyah?

Yes, we serve Al Faisaliyah. Send photos of the pool and its edges, and we will outline the steps suited to its condition.

Does cementitious waterproofing work for both in-ground and above-ground pools?

Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Do you cover Al Faisaliyah (near Ar Rafiah)?

Yes. We serve Al Faisaliyah (near Ar Rafiah) and nearby areas such as Al Andalus (near Ar Rafiah), Eshbilya and Ghirnatah (near Ar Rafiah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Nearby areas

Areas near Al Faisaliyah (near Ar Rafiah)

Nearby areas we also cover: Al Andalus (near Ar Rafiah), Eshbilya and Ghirnatah (near Ar Rafiah).

Other services in the area

More services in Al Faisaliyah (near Ar Rafiah)

Empty seaside pool during waterproofing

Tell us about your site in Al Faisaliyah (near Ar Rafiah)
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp