
Cementitious pool waterproofing in At Taawun (near Al Khobar)
Cementitious pool waterproofing in At Taawun starts with photos of the pool walls and floor, sent by call or WhatsApp. The district has villas and homes with private pools, some old and some new, and the method depends on the condition of the concrete and tiles.
At Taawun is a district of villas and homes with private pools, built at different times and to different standards. Older pools often show hairline cracks in the walls and at joints, and the tile or render may be loosening. Newer pools may only need their coating renewed. The photos show which case applies before any method is chosen.
- At Taawun is a residential district in the Eastern Province, close to Al Khuzama, Al Hamra and Al Jisr.
- An open pool is exposed to sun and water constantly, so its coating must tolerate movement and expansion.
The scope of the work in At Taawun (near Al Khobar)
- Wet curing after application so the coating sets correctly
- Checking the pool walls and floor and locating cracks and openings
- Treating hairline cracks and the wall-to-floor junction
- Closing return pipe openings and drain outlets before the coating goes on
How we carry out cementitious pool waterproofing in At Taawun (near Al Khobar)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
We serve At Taawun (near Al Khobar) and around itIncluding Al Khuzama (near Al Khobar), Al Hamra (near Al Khobar) and Al Jisr, as part of our work across the Eastern Province.
Your request from At Taawun (near Al Khobar) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Before you book cementitious pool waterproofing in At Taawun (near Al Khobar)
Can an old pool in At Taawun be waterproofed without demolition?
In many cases yes, provided the concrete is sound. Cracks and joints are treated first, then the flexible cement coating goes on; if the structure is badly damaged, the photos will show it.
Do you work on villa pools in At Taawun?
Yes, we serve At Taawun. Send photos of the pool walls, floor and water inlets, and tell us whether the pool is open or covered so we can plan the steps with you.
What decides the cost of cementitious pool waterproofing?
The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.
What should I send you from At Taawun (near Al Khobar)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in At Taawun (near Al Khobar), and we will work out the next step with you.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
The same service in nearby areas
If the site is outside At Taawun (near Al Khobar), the same service is available in Al Khuzama (near Al Khobar), Al Hamra (near Al Khobar) and Al Jisr.
More services in At Taawun (near Al Khobar)

