
Cementitious pool waterproofing in Al Hamra (near Al Khobar)
Cementitious pool waterproofing in Al Hamra begins with photos of the pool walls, floor and tiled edge, sent by call or on WhatsApp. We serve Al Hamra, where many homes have a private pool set within the plot, so the first step is seeing how the shell and tiles are behaving.
Al Hamra has many detached villas on private plots, and a good number of them have a pool built into the garden or beside the house. Those pools are often concrete shells of varied age, where the walls and floor can show hairline cracks and the grout at the tile line may lose its seal. A flexible cement-based coating can cover the concrete and close those fine cracks, but whether it suits a given shell depends on the crack pattern and the surface beneath. The photos show what is there before any method is discussed.
- Al Hamra is a district in the Eastern Province, lying close to Al Khawr, Al Jisr and Ibn Sina.
- Cast concrete pool shells tend to crack at corners, wall joints and where the floor meets the wall.
The scope of the work in Al Hamra (near Al Khobar)
- Checking the pool walls and floor and locating cracks and openings
- Cleaning the concrete surface and removing any adhesive residue or dust
- Treating hairline cracks and the wall-to-floor junction
- Closing return pipe openings and drain outlets before the coating goes on
This is how we work in Al Hamra (near Al Khobar)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
We serve Al Hamra (near Al Khobar) and around itIncluding Al Khawr, Al Jisr and Ibn Sina, as part of our work across the Eastern Province.
Al Hamra (near Al Khobar) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Common questions on cementitious pool waterproofing in Al Hamra (near Al Khobar)
Can a pool in Al Hamra with hairline cracks be coated?
Often yes, when the concrete is sound and the cracks are fine. The photos of the walls, floor and tile line show whether the shell can take the coating directly or needs repair first, and we will say which applies.
Do you work on private villa pools in Al Hamra?
Yes, we serve Al Hamra. Send photos of the pool, its tiled edge and the garden around it, and tell us whether the pool is in regular use so we can plan the work with you.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
What decides the cost of cementitious pool waterproofing?
The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.
What should I send you from Al Hamra (near Al Khobar)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Hamra (near Al Khobar), and we will work out the next step with you.
More services in Al Hamra (near Al Khobar)

