
Cementitious pool waterproofing in As Sinaiyah (near Abqaiq)
We coat cementitious pools in As Sinaiyah with a flexible layer bonded to the concrete, starting with photos sent by call or WhatsApp. The photos show the walls and floor, and whether the surface needs preparing before the coating goes on.
As Sinaiyah has a mix of buildings, from houses to smaller premises with their own basins and pools, and most of these basins are open to the sky. Older exposed basins often show cracks at the corners and wear in the surface coating, and moisture may come in around the edge. Sun heats the exposed surface, which expands and contracts as temperatures change. The photos therefore determine the right treatment for each basin.
- As Sinaiyah is an area in Al-Ahsa in the Eastern Province, close to An Nuzhah, Al Madinah and the airport.
- An open basin is exposed to airborne dust and water salts, which affect adhesion if the surface is not cleaned properly.
The main items of cementitious pool waterproofing in As Sinaiyah (near Abqaiq)
- Cleaning the concrete surface and removing any adhesive residue or dust
- Checking the pool walls and floor and locating cracks and openings
- Closing return pipe openings and drain outlets before the coating goes on
- Wet curing after application so the coating sets correctly
The steps of cementitious pool waterproofing in As Sinaiyah (near Abqaiq)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Cementitious pool waterproofing in As Sinaiyah (near Abqaiq)We choose the method and the materials once we know the condition of the spot.
Start from As Sinaiyah (near Abqaiq) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on cementitious pool waterproofing in As Sinaiyah (near Abqaiq)
Does the flexible coating work on an open basin in As Sinaiyah?
It works when the surface is sound, clean and dry at application. The photos show whether the concrete needs treatment before the layer goes on.
How does pool coating start in As Sinaiyah?
It starts with sending photos of the walls, floor and any leak you notice, by call or WhatsApp. We serve As Sinaiyah, and from the photos we set the steps with you.
Do you offer cementitious pool waterproofing in As Sinaiyah (near Abqaiq)?
Yes. As Sinaiyah (near Abqaiq) is within our service area in the Eastern Province, and we also work in An Nuzhah (near Abqaiq), Al Madinah and Airport (near Abqaiq). Call us or send photos of the spot on WhatsApp.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
What decides the cost of cementitious pool waterproofing?
The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
Areas near As Sinaiyah (near Abqaiq)
If the site is outside As Sinaiyah (near Abqaiq), the same service is available in An Nuzhah (near Abqaiq), Al Madinah and Airport (near Abqaiq).
More services in As Sinaiyah (near Abqaiq)

