Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Al Madinah

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Al Madinah

Cementitious pool waterproofing in Al Madinah begins with a pool photo sent by call or WhatsApp. The district has residential buildings of varied ages and villas, most with private pools.

Pools in Al Madinah range from older pools in older buildings to newer ones in modern villas. Older concrete pools often show hairline cracks and leaks from corners and joints, while newer ones may only need coating renewal. A flexible cementitious coating seals concrete, protects tiles, and stops water leaks. Photos identify the pool's state and the treatment needed.

  • Al Madinah is a residential district in Al-Ahsa with apartment buildings and villas, lying close to As Sinaiyah, the airport, and An Nuzhah.
  • Pools shared between multiple units in older buildings experience increased stress on concrete and coating from repeated usage changes.
What the service includes

What we do for you in Al Madinah

  • Wet curing after application so the coating sets correctly
  • Applying the flexible cementitious layer over the whole shell
  • Treating hairline cracks and the wall-to-floor junction
  • Checking the pool walls and floor and locating cracks and openings
How we work

From first contact to the finished job in Al Madinah

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Your request from Al Madinah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Madinah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on cementitious pool waterproofing in Al Madinah

Can a shared pool in an old building be waterproofed easily?

Yes, but it depends on the concrete and current coating condition. Photos show whether the concrete is repairable or requires more involved work.

Do you work on both new and old villa pools in Al Madinah?

Yes, we serve Al Madinah. Send photos of the pool showing walls, floor, and any areas with leaks or damage, so we can assess it accurately with you.

Do you cover Al Madinah?

Yes. We serve Al Madinah and nearby areas such as As Sinaiyah (near Abqaiq), Airport (near Abqaiq) and An Nuzhah (near Abqaiq), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

How does cementitious waterproofing differ from other pool coatings?

Cementitious waterproofing is cement-based with flexible additives; it bonds to concrete and accepts tile adhesive directly on top. Other types such as polyurethane or epoxy have different properties and suit different situations. The choice depends on the concrete condition and whether tiles are going on, which the photos help us work out.

Nearby areas

Areas near Al Madinah

Nearby areas we also cover: As Sinaiyah (near Abqaiq), Airport (near Abqaiq) and An Nuzhah (near Abqaiq).

Other services in the area

More services in Al Madinah

Empty seaside pool during waterproofing

Tell us about your site in Al Madinah
and we will plan the next step with you

Describe the problem and where it is in Al Madinah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp