
PVC membrane waterproofing in Industrial Area
PVC membrane waterproofing for industrial buildings and warehouses begins with your photos by WhatsApp or call. The industrial district has large buildings with wide roofs, and roof size and condition affect membrane choice and installation.
The industrial district has warehouses, workshops and production buildings with wide metal or concrete roofs. Metal roofs need special preparation before membrane installation to ensure adhesion, and old concrete roofs may have cracks and leaks requiring prior treatment. Large roofs need work to be divided and joints and openings carefully managed to ensure full protection. Photos and measurements determine the installation plan and schedule.
- The Industrial Area is a specialized district in the Eastern Province near the Second and First Industrial Areas, with warehouses, workshops and production buildings.
- Wide industrial roofs collect water at low points, so waterproofing must be tight and water drainage must be effective.
What we do for you in Industrial Area
- Sealing the layer at the parapet, AC bases and all penetrations
- Welding seams with hot air and checking them after cooling
- Laying PVC sheets and fixing them by the method that suits the site
- Cleaning the surface and treating cracks and joints before laying
The stages of the work in Industrial Area
Send photos of the roof or tank
On WhatsApp: photos of the full roof, the parapet, AC bases, pipe openings and drains, so we can assess the surface and decide the right fixing method and treatment.
Prepare the surface
The concrete slab is cleaned and cracks and joints are treated; old insulation is removed where its condition does not allow installation over it, and the surface is left to dry before any further step.
Lay the sheets and weld the seams
PVC sheets are laid across the surface and fixed by the method that suits the position; seams between sheets are welded with hot air, and the layer is turned up at the parapet and around penetrations.
Check the seams and add the protection layer
Welded seams are checked for continuity, then a protection layer or ballast is added over the membrane on exposed roofs so the PVC is kept from direct sun and foot traffic.
Why Abraj Al Azl?
The seam disappears in the weldHeat welding fuses the two sheet edges into one layer, so no exposed edge remains for water to get through.
Your request from Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Industrial Area and around itIncluding Second Industrial Area, First Industrial Area and Yanbu, as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Before you book PVC membrane waterproofing in Industrial Area
Can a metal roof be waterproofed with a PVC membrane in the industrial district?
Yes, but a metal roof needs special cleaning and preparation before installation. We remove rust and dirt and apply a suitable primer to ensure the membrane adheres tightly. Photos clarify the roof condition and work needed.
How long does it take to waterproof a large roof in the industrial district?
Time depends on roof size, condition, and number of openings and joints. Photos and measurements help us estimate duration and plan work with you. We will give you details after reviewing the photos.
Can PVC sheets be installed over an existing old membrane?
If the old membrane is firm and its surface is level it may be possible to install over it in some cases, but if there are blisters, crumbling or partial adhesion, it is removed first so the new sheets weld onto a solid surface. Photos will settle that decision.
How are PVC sheets sealed around AC bases and pipe penetrations?
At each penetration the sheet is cut closely and welded around it with shaped PVC pieces, so no open edge remains. These points are the most common source of roof leaks, so they receive careful attention before moving on to the protection layer.
Do you cover Industrial Area?
Yes. We serve Industrial Area and nearby areas such as Second Industrial Area, First Industrial Area and Yanbu, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
What is the difference between PVC sheets and bitumen rolls for roof waterproofing?
Bitumen rolls are usually torch-applied and are stiffer, while PVC sheets are lighter, more flexible and their seams are welded with hot air rather than a flame. Each suits different situations; send photos of the roof so we can advise which fits.
Areas near Industrial Area
If the site is outside Industrial Area, the same service is available in Second Industrial Area, First Industrial Area and Yanbu.
More services in Industrial Area



