Abraj Al AzlContracting
Call العربية
Excavated villa foundation wall coated with black bitumen and a protection board

Foundation waterproofing in Utayyiq

Sealed before backfill

Waterproofing for foundations and below-ground walls with bitumen and membranes

+966 54 311 2066
The service in your area

Foundation waterproofing in Utayyiq

Foundation waterproofing in Utayyiq starts with a photo of the footing and the wall close to the ground, sent by call or WhatsApp. Utayyiq is a small village near Al Husayy, Nita and Mulayjah, with houses and farms on wider plots, whose footings are exposed to soil moisture from several sides.

Houses and farms in Utayyiq sit on wider plots, so their footings meet soil from more than one side. Outer walls surrounded by earth need waterproofing that joins the footing itself, otherwise moisture enters through the exposed side. Bitumen and membranes are used for the buried section, and the photos show which sides need the most attention.

  • Utayyiq is a small village in the Al-Ahsa governorate of the Eastern Province, close to Al Husayy, Nita and Mulayjah.
  • A wall surrounded by soil on three sides carries more moisture pressure than one that touches the ground on a single side.
What the service includes

What the service covers in Utayyiq

  • Checking the concrete walls and footing and locating cracks, joints and pipe openings
  • Fixing protection boards over the waterproof layer before backfill
  • Cleaning the surface and removing loose material and oil
  • Treating cracks, pipe openings and joints before waterproofing
How we work

The stages of the work in Utayyiq

1

Send site photos

On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.

2

Prepare the surface

The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.

3

Apply the waterproof layer

Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.

4

Protection boards then backfill

Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.

What sets us apart

Why Abraj Al Azl?

The structure kept from moisture and saltsConstant moisture attacks the reinforcement and weakens the concrete over time, and the waterproof layer cuts that off from the start.

We serve Utayyiq and around itIncluding Al Husayy, Nita and Mulayjah, as part of our work across the Eastern Province.

Utayyiq is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Utayyiq

Does a farm in Utayyiq need all its footings waterproofed?

Not always, since a large area does not mean every footing is damaged. From the photos we identify which footings meet the soil and need waterproofing, and which only need checking.

How does footing waterproofing connect to the surrounding wall in Utayyiq?

The membrane runs from the footing up the outer wall to a suitable height above ground, so moisture finds no way in at the joint. The end point is set from the photos.

What do the protection boards do over the waterproof layer?

Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.

Do you offer foundation waterproofing in Utayyiq?

Yes. Utayyiq is within our service area in the Eastern Province, and we also work in Al Husayy, Nita and Mulayjah. Call us or send photos of the spot on WhatsApp.

What decides the cost of foundation waterproofing?

The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.

What is the difference between waterproofing foundations in a new build and in an existing building?

In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.

Nearby areas

Areas near Utayyiq

If the site is outside Utayyiq, the same service is available in Al Husayy, Nita and Mulayjah.

Other services in the area

More services in Utayyiq

Two workers on the roof insulating around an AC unit

Your first step in Utayyiq:
a call or a WhatsApp message

Call us or send photos of the walls and the foundation on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp