Abraj Al AzlContracting
Call العربية
Excavated villa foundation wall coated with black bitumen and a protection board

Foundation waterproofing in Mehdar

Sealed before backfill

Waterproofing for foundations and below-ground walls with bitumen and membranes

+966 54 311 2066
The service in your area

Foundation waterproofing in Mehdar

Foundation waterproofing in Al Mehdar starts with photos of the building and its base, sent by call or WhatsApp. The village has houses, villas and small buildings whose foundations meet the ground and its moisture, so each base is assessed from the photos before a method is chosen.

In Eastern Province villages, houses and villas are often small and rest on foundations set directly into the ground, so rising damp on lower walls can appear over time. Waterproofing treats the perimeter of the base and the underside of ground-level walls, and the approach varies with each building's depth and wall condition. The photos show whether the damage is limited to the surface or reaches the structure itself.

  • Al Mehdar is a village in the Al-Ahsa governorate of the Eastern Province, close to Salwa, As Sikak and Ibn Dihman.
  • Moisture travels from the soil into lower walls through the foundation, showing first near ground level and worsening over time.
What the service includes

The foundation waterproofing work in Mehdar

  • Checking the concrete walls and footing and locating cracks, joints and pipe openings
  • Fixing protection boards over the waterproof layer before backfill
  • Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
  • Cleaning the surface and removing loose material and oil
How we work

From first contact to the finished job in Mehdar

1

Send site photos

On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.

2

Prepare the surface

The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.

3

Apply the waterproof layer

Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.

4

Protection boards then backfill

Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.

What sets us apart

Why Abraj Al Azl?

No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.

Your request from Mehdar comes to usCall or WhatsApp on one number, and we answer you ourselves.

Foundation waterproofing in MehdarWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Mehdar

Can an old house foundation in Al Mehdar be waterproofed?

In many cases yes, provided the structure is sound. The base is checked from the photos before a method is chosen, and any structural damage will be stated clearly to you.

Do you treat rising damp in ground-floor walls in Al Mehdar?

Yes, we serve Al Mehdar. Send photos of the ground-floor wall and the base, and tell us whether the damp shows on the wall itself or close to the ground.

What materials are used in foundation waterproofing?

Common materials include torch-on or self-adhesive bitumen rolls, cold bitumen coating, and composite membranes, together with protection boards that shield the layer from soil pressure and backfill. The material choice depends on the wall, the soil conditions and the depth of the foundation.

What decides the cost of foundation waterproofing?

The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.

What is the difference between waterproofing foundations in a new build and in an existing building?

In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.

Is Mehdar within your service area?

Yes, Mehdar is one of the areas we work in, as are Salwa, As Sikak and Ibn Dihman. To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Mehdar, the same service is available in Salwa, As Sikak and Ibn Dihman.

Other services in the area

More services in Mehdar

Two workers on the roof insulating around an AC unit

Your first step in Mehdar:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp