Abraj Al AzlContracting
Call العربية
Excavated villa foundation wall coated with black bitumen and a protection board

Foundation waterproofing in Industrial Arifi

Sealed before backfill

Waterproofing for foundations and below-ground walls with bitumen and membranes

+966 54 311 2066
The service in your area

Foundation waterproofing in Industrial Arifi

Foundation waterproofing in Industrial Arifi starts with photos of the building and its base, sent by call or WhatsApp. The area holds buildings, warehouses and workshops, whose ground walls face equipment traffic and wastewater.

Industrial Arifi consists of industrial buildings, warehouses and service units of widely varying size and age. Foundations here face heavy loads and water seeping from floors and wash areas, so damp often appears at the joints of ground walls. The coating is chosen according to building size and use, which the photos establish before any decision.

  • Industrial Arifi is an industrial district in the Al-Ahsa governorate of the Eastern Province, close to Al Yarmuk, Al Tawyah and Al Dabab.
  • Water leaking from workshop floors reaches the base and weakens ground-wall joints if it is not treated.
What the service includes

The foundation waterproofing work in Industrial Arifi

  • Cleaning the surface and removing loose material and oil
  • Treating cracks, pipe openings and joints before waterproofing
  • Checking layer continuity at corners, edges and critical points
  • Checking the concrete walls and footing and locating cracks, joints and pipe openings
How we work

How we carry out foundation waterproofing in Industrial Arifi

1

Send site photos

On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.

2

Prepare the surface

The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.

3

Apply the waterproof layer

Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.

4

Protection boards then backfill

Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.

What sets us apart

Why Abraj Al Azl?

No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.

We serve Industrial Arifi and around itIncluding Al Yarmuk (near Ghizlan), Al Tawyah and Al Dabab (near Ghizlan), as part of our work across the Eastern Province.

Start from Industrial Arifi with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book foundation waterproofing in Industrial Arifi

Is waterproofing suitable for a warehouse carrying heavy loads?

It can be, but the type and thickness of the layer are set after reviewing the photos and understanding how the building is used. Tell us about the loads so we can choose the right option.

Can the base of a working workshop be sealed without stopping operations?

Usually the work needs to be scheduled around operations to protect the sealed wall. Let us know your activity timetable so we can agree on the most suitable way to proceed.

What do the protection boards do over the waterproof layer?

Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.

What decides the cost of foundation waterproofing?

The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.

Is the waterproof layer affected by salty soil?

Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.

What should I send you from Industrial Arifi?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Industrial Arifi, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

If the site is outside Industrial Arifi, the same service is available in Al Yarmuk (near Ghizlan), Al Tawyah and Al Dabab (near Ghizlan).

Other services in the area

More services in Industrial Arifi

Two workers on the roof insulating around an AC unit

In Industrial Arifi and need foundation waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp