
Foundation waterproofing in Hajr
Foundation waterproofing in Hajr begins with photos sent via WhatsApp or call. Hajr contains houses, villas and both old and new buildings, whose foundations face moisture and mineral salts in the soil.
Hajr is a mixed residential area with old apartment buildings having thin foundation walls and modern villas with deeper footings. Ground walls in older buildings show cracks and visible water absorption from years of exposure to moisture and salt. Salts in the soil react with moisture and cause concrete cracking and steel corrosion. Modern waterproof materials create a barrier that stops permeability and protects walls from gradual damage. Method choice depends on the building age and severity of existing damage.
- Hajr is a district in the Eastern Province, near Tihamah, Al Ferdous and Qasr Al Khalij, with houses, villas and old and new apartment buildings.
- Mineral salts in soil accelerate concrete deterioration when combined with moisture, making waterproofing necessary to preserve the structure.
The scope of the work in Hajr
- Checking layer continuity at corners, edges and critical points
- Fixing protection boards over the waterproof layer before backfill
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
- Treating cracks, pipe openings and joints before waterproofing
How we carry out foundation waterproofing in Hajr
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
The structure kept from moisture and saltsConstant moisture attacks the reinforcement and weakens the concrete over time, and the waterproof layer cuts that off from the start.
Your request from Hajr comes to usCall or WhatsApp on one number, and we answer you ourselves.
Foundation waterproofing in HajrWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Common questions on foundation waterproofing in Hajr
Is white dampness on ground walls in Hajr from salt or from water?
Usually both together. Water dissolves salts and brings them up from the soil to the surface where they crystallise white. Foundation waterproofing cuts off the water path and stops salt rising.
How many layers of waterproofing does a foundation in Hajr need?
The number depends on material type, existing moisture and surface condition. Some cases need one thick layer, others need several thin ones. Photos help us determine what is right.
What is the difference between waterproofing foundations in a new build and in an existing building?
In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.
What should I send you from Hajr?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Hajr, and we will work out the next step with you.
What materials are used in foundation waterproofing?
Common materials include torch-on or self-adhesive bitumen rolls, cold bitumen coating, and composite membranes, together with protection boards that shield the layer from soil pressure and backfill. The material choice depends on the wall, the soil conditions and the depth of the foundation.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
The same service in nearby areas
We also work near Hajr, in Tihamah, Qasr Al Khalij and Al Ferdous (near Dammam).
More services in Hajr



