
Foundation waterproofing in Government Departments
Foundation waterproofing in the Government Departments area begins with a photo of the building and its below-ground walls, sent by call or WhatsApp. The area holds institutional buildings and public facilities alongside housing, and foundation depths differ according to the building type.
Buildings in this area include offices, public facilities and housing nearby, and their foundations are often large to carry heavy loads. In bigger structures damp tends to appear at below-ground floors and around concrete footings in contact with the soil. The photos show where the problem sits and how far it spreads, and from them we decide whether the waterproofing is done externally or internally.
- The Government Departments area is in Hofuf, Al-Ahsa, in the Eastern Province, close to Yebrin and Ar Rabie.
- Below-ground floors in large buildings carry constant soil pressure, so their joints need particular care.
What the service covers in Government Departments
- Checking layer continuity at corners, edges and critical points
- Fixing protection boards over the waterproof layer before backfill
- Treating cracks, pipe openings and joints before waterproofing
- Checking the concrete walls and footing and locating cracks, joints and pipe openings
The stages of the work in Government Departments
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
Your request from Government Departments comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Government Departments and around itIncluding Yebrin (near Al Ekhaa), Yabrin (near Al Khunn) and Ar Rabie (near Al Khunn), as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Government Departments
Do you waterproof foundations of large institutional buildings here?
Yes, when the condition suits it. Send photos of the building and the buried area so we can assess the scope of the work before suggesting any method.
Does damp appear differently in facilities near Yebrin?
The ground and the construction determine this, and it can vary from building to building even in the same area. The photos show the difference, and we assume no cause before reviewing them.
What decides the cost of foundation waterproofing?
The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.
What is the difference between waterproofing foundations in a new build and in an existing building?
In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.
Do you offer foundation waterproofing in Government Departments?
Yes. Government Departments is within our service area in the Eastern Province, and we also work in Yebrin (near Al Ekhaa), Yabrin (near Al Khunn) and Ar Rabie (near Al Khunn). Call us or send photos of the spot on WhatsApp.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
The same service in nearby areas
Nearby areas we also cover: Yebrin (near Al Ekhaa), Yabrin (near Al Khunn) and Ar Rabie (near Al Khunn).
More services in Government Departments



