Foundation waterproofing in Al Matrafiyah
Foundation waterproofing in Al Matrafiyah starts with photos of the affected wall or slab, sent to us by call or on WhatsApp. The district is residential, dominated by houses and low-rise homes where ground-level walls meet damp earth, so the work is planned around what the photos show.
Al Matrafiyah is made up mostly of houses with a ground floor and sometimes a semi-basement store, and many were built with their walls set directly against the earth. In these homes damp usually appears at the lower part of the wall, where it meets the floor, or along the outer edge of a slab. Bitumen coatings and membranes go on the outside of the structure where the condition allows, and on the inside if the outside cannot be reached. The photos show whether that route is possible for your building.
- Al Matrafiyah is a district in the Eastern Province, with Al Fasl, Al Firdaws and Al Farouq among the nearest named places.
- Ground-contact walls are where foundation damp is usually noticed first, often before it reaches the floor finish.
What we do for you in Al Matrafiyah
- Cleaning the surface and removing loose material and oil
- Fixing protection boards over the waterproof layer before backfill
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
- Checking layer continuity at corners, edges and critical points
The stages of the work in Al Matrafiyah
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
The structure kept from moisture and saltsConstant moisture attacks the reinforcement and weakens the concrete over time, and the waterproof layer cuts that off from the start.
Your request from Al Matrafiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from Al Matrafiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on foundation waterproofing in Al Matrafiyah
Can damp in a ground-floor wall be treated from inside?
Sometimes, but treating only the inside often leaves the source in the soil behind the wall. The photos will show whether the outside can be reached and which approach suits the wall.
Do you work on semi-basement stores in Al Matrafiyah?
We serve Al Matrafiyah, including homes with a semi-basement store. Send photos of the lower walls and floor edge, and tell us which side of the wall is accessible so the route can be planned with you.
How do I request foundation waterproofing in Al Matrafiyah?
Call us, or send clear photos of the spot and its location in Al Matrafiyah on WhatsApp, and we will work out the next step with you.
What do the protection boards do over the waterproof layer?
Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
Is the waterproof layer affected by salty soil?
Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.