
Foundation waterproofing in Al Matar (near An Nabiyah)
Foundation waterproofing in Al Matar starts with photos of the foundation wall, the damp-proof course line and the paving outside, sent by call or WhatsApp. The district includes newer residential schemes and villas on wider plots, where the lower wall is often easier to reach from outside.
Al Matar includes newer residential schemes and villas on wider plots, which usually leaves room around a building and makes external coating of the foundation practical. A damp-proof course may have been laid at the base, but its condition and continuity only show in the photos. Where a building has a basement or a ground-floor garage, moisture from the soil can rise into the lowest inside walls. The coating follows what is found, with bitumen suited to buried surfaces and membranes where movement or cracks are present.
- Al Matar is a district of Dammam in the Eastern Province, close to Al Amanah and Ash Shrouk.
- A damp-proof course only works when it is continuous, so gaps at corners matter a great deal.
The foundation waterproofing work in Al Matar (near An Nabiyah)
- Treating cracks, pipe openings and joints before waterproofing
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
- Cleaning the surface and removing loose material and oil
- Checking the concrete walls and footing and locating cracks, joints and pipe openings
The steps of foundation waterproofing in Al Matar (near An Nabiyah)
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
Al Matar (near An Nabiyah) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Start from Al Matar (near An Nabiyah) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Matar (near An Nabiyah)
Is a newer house less likely to need foundation work?
Age alone does not decide it. A newer foundation can still show damp where the damp-proof course is broken or the outside ground has been raised, so photos of the wall base matter more than the building's age.
Can you assess a garage wall that sits below ground level?
Yes, if the wall is reachable and the photos show damp. A below-ground garage wall often needs its outer face treated, and the photos will tell us whether that is possible or whether the work should be done inside.
What do the protection boards do over the waterproof layer?
Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.
What is the difference between waterproofing foundations in a new build and in an existing building?
In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.
Do you offer foundation waterproofing in Al Matar (near An Nabiyah)?
Yes. Al Matar (near An Nabiyah) is within our service area in the Eastern Province, and we also work in Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan. Call us or send photos of the spot on WhatsApp.
Is the waterproof layer affected by salty soil?
Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.
Areas near Al Matar (near An Nabiyah)
We also offer foundation waterproofing in Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan, among the closest areas to Al Matar (near An Nabiyah).
More services in Al Matar (near An Nabiyah)



