
Foundation waterproofing in Al Majd
Foundation waterproofing in Al Majd starts with messages containing photos of the foundation and any damp, sent by call or WhatsApp. Al Majd is a residential district with villas and houses that have concrete foundations prone to water seepage or rising moisture. Waterproofing protects foundation walls from erosion and structural damage caused by groundwater.
Al Majd consists of villas and houses on separate plots, each with a concrete foundation sitting on soil. Foundation walls face moisture from surrounding soil and groundwater, especially after the rare heavy rains that can saturate the earth. Fine cracks and damp patches on the inside wall signal that exterior waterproofing is needed. Bitumen and membranes are applied to the foundation's outer face to stop water seeping in, and the method depends on the groundwater level and moisture severity shown in photos.
- Al Majd is a district in the Eastern Province, close to Al Wahah, Ash Shihiyah and Al Wurud, with houses and villas spread across individual plots.
- Foundations of houses and villas in residential districts sit at modest heights above ground, leaving lower walls close to soil moisture.
What we do for you in Al Majd
- Treating cracks, pipe openings and joints before waterproofing
- Cleaning the surface and removing loose material and oil
- Checking the concrete walls and footing and locating cracks, joints and pipe openings
- Checking layer continuity at corners, edges and critical points
The stages of the work in Al Majd
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
Start from Al Majd with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Al Majd and around itIncluding Al Wahah (near Ash Shihiyah), Ash Shihiyah and Al Wurud (near Ash Shihiyah), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on foundation waterproofing in Al Majd
Can a foundation in an old Al Majd house be waterproofed only from inside?
Inside waterproofing reduces moisture but does not protect the concrete itself from damage. Exterior waterproofing is better, and if the foundation is backfilled we may find a mixed solution. Photos and details settle it with you.
When do I need foundation waterproofing in Al Majd?
When you see persistent damp patches on a lower wall, cracks in the foundation, or a musty smell in a basement room. Send photos and call so we can assess the situation with you.
Do you offer foundation waterproofing in Al Majd?
Yes. Al Majd is within our service area in the Eastern Province, and we also work in Al Wahah (near Ash Shihiyah), Ash Shihiyah and Al Wurud (near Ash Shihiyah). Call us or send photos of the spot on WhatsApp.
What do the protection boards do over the waterproof layer?
Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.
What is the difference between waterproofing foundations in a new build and in an existing building?
In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.
Is the waterproof layer affected by salty soil?
Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.
We also offer it in neighbouring areas
Nearby areas we also cover: Al Wahah (near Ash Shihiyah), Ash Shihiyah and Al Wurud (near Ash Shihiyah).
More services in Al Majd



