
Foundation waterproofing in Al Fiwan
In Al Fiwan we waterproof foundations and below-ground walls with bitumen and membranes made for buried masonry. Send photos of the foundation and its surroundings by call or WhatsApp, and the images will show the type and extent of the damp before a method is chosen.
Al Fiwan is largely standalone homes on fairly wide plots, many built with foundations that extend below ground to carry the loads. Damp here usually comes from the soil against the outer wall, especially at corners and entrances. Needs differ between a newer house and an older one, and the depth of the buried section decides how much waterproofing is required.
- Al Fiwan is a hamlet in the Al-Ahsa governorate of the Eastern Province, close to Ash Shifa, Al Jamiah and Ghirnatah.
- A buried wall draws damp from the soil all year, so its waterproofing needs a material that stays flexible and bonded to the concrete.
The scope of the work in Al Fiwan
- Checking layer continuity at corners, edges and critical points
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
- Treating cracks, pipe openings and joints before waterproofing
- Checking the concrete walls and footing and locating cracks, joints and pipe openings
How we carry out foundation waterproofing in Al Fiwan
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
Foundation waterproofing in Al FiwanWe choose the method and the materials once we know the condition of the spot.
Start from Al Fiwan with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on foundation waterproofing in Al Fiwan
Can rising damp from the ground be treated in Al Fiwan houses?
Yes, rising damp is usually handled with a horizontal barrier at the base of the wall together with a layer on the buried wall. The photos show whether the damp really rises or enters from the side.
What information helps us assess a house foundation in Al Fiwan?
Photos of the wall from outside and inside, where the damp shows on it, and whether it appeared after rain. These are usually enough to tell whether the case needs full waterproofing.
Do you offer foundation waterproofing in Al Fiwan?
Yes. Al Fiwan is within our service area in the Eastern Province, and we also work in Ash Shifa (near Hafar Al-Batin), Al Jamiah (near Qaisumah) and Ghirnatah (near Hafar Al-Batin). Call us or send photos of the spot on WhatsApp.
Is the waterproof layer affected by salty soil?
Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.
What do the protection boards do over the waterproof layer?
Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
The same service in nearby areas
We also offer foundation waterproofing in Ash Shifa (near Hafar Al-Batin), Al Jamiah (near Qaisumah) and Ghirnatah (near Hafar Al-Batin), among the closest areas to Al Fiwan.
More services in Al Fiwan



