
Foundation waterproofing in Al Fanar
Foundation waterproofing in Al Faysaliyah begins with photos of the foundation and damp areas sent by WhatsApp or call. The district features a mix of modern villas and houses on varied plots, some facing waterproofing challenges due to proximity to damp areas. We need photos to assess your foundation's specific needs.
Al Faysaliyah mixes contemporary villas and houses on varied plot sizes and locations within the district. Foundations here vary in depth and treatment by building age and location; some modern villas have deep foundations reaching higher moisture levels. Lower walls and basement floors are exposed to seepage and dampness, especially in villas with pools or underground rooms. Photos clearly show the leak location, moisture type and concrete foundation condition.
- Al Faysaliyah is a district in the Eastern Province, near Ar Rawdah, An Nada and Al Qadisiyah, with modern villas and houses.
- Villas with pools and underground areas need stronger foundation waterproofing due to ongoing extra moisture.
What we do for you in Al Fanar
- Cleaning the surface and removing loose material and oil
- Treating cracks, pipe openings and joints before waterproofing
- Checking layer continuity at corners, edges and critical points
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
The steps of foundation waterproofing in Al Fanar
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
We serve Al Fanar and around itIncluding King Faisal University, An Nawras and As Saif, as part of our work across the Eastern Province.
Start from Al Fanar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Common questions on foundation waterproofing in Al Fanar
If a villa in Al Faysaliyah has a pool, does that affect the villa's foundation?
Yes, directly. A pool increases moisture around the foundation, especially if water leaks from the pool or drainage pipes. The waterproofing around the pool and the nearby foundation must be very strong. Photos will show the pool's relationship to the foundation.
Does foundation waterproofing in Al Faysaliyah also need drain treatment around the villa?
Often yes, because poor drainage around the villa causes water to collect near the foundation. External drain treatment may be necessary alongside foundation waterproofing itself. Photos will help us understand the drainage situation around your villa.
What decides the cost of foundation waterproofing?
The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
Do you cover Al Fanar?
Yes. We serve Al Fanar and nearby areas such as King Faisal University, An Nawras and As Saif, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Is the waterproof layer affected by salty soil?
Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.
Foundation waterproofing near Al Fanar
We also offer foundation waterproofing in King Faisal University, An Nawras and As Saif, among the closest areas to Al Fanar.
More services in Al Fanar



