Excavated villa foundation wall coated with black bitumen and a protection board

Foundation waterproofing in Al Batin

Sealed before backfill

Waterproofing for foundations and below-ground walls with bitumen and membranes

+966 54 311 2066
The service in your area

Foundation waterproofing in Al Batin

We waterproof foundations and below-ground walls in Al Batin from photos of the buried walls and surrounding soil, sent by call or WhatsApp. The district mixes villas with small residential buildings, and foundation depth and access vary from one building to the next.

Al Batin contains detached villas alongside small residential buildings, and foundation excavation differs noticeably between them. In buildings with deeper foundations, the outer walls are more exposed to soil pressure and surrounding water, so flexible membranes over bitumen are commonly used. The photos show how much of the wall is exposed and how it should be lined before any work begins.

  • Al Batin is a residential district of Hafar Al-Batin in the Eastern Province, near Abu Musa Al Ashari, Al Fayha and Fulaij.
  • The deeper the foundation, the greater the pressure on the outer wall, so the membrane should be chosen according to how much is exposed rather than appearance.
What the service includes

The foundation waterproofing work in Al Batin

  • Checking layer continuity at corners, edges and critical points
  • Cleaning the surface and removing loose material and oil
  • Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
  • Treating cracks, pipe openings and joints before waterproofing
How we work

This is how we work in Al Batin

1

Send site photos

On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.

2

Prepare the surface

The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.

3

Apply the waterproof layer

Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.

4

Protection boards then backfill

Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.

What sets us apart

Why Abraj Al Azl?

No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.

Al Batin is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Batin and around itIncluding Abu Musa Al Ashari, Al Fayha (near Hafar Al-Batin) and Fulaij, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Batin

Do villas in Al Batin need more foundation waterproofing than other buildings?

Not necessarily. The need depends on excavation depth, how exposed the wall is and the soil condition visible in the photos, not on building type alone.

What should I send for the foundation photos?

Send photos of the outer wall from several angles, a photo of the inside floor near the wall, and one of the surrounding area. These let us see the condition and tell you what is needed.

What do the protection boards do over the waterproof layer?

Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.

What decides the cost of foundation waterproofing?

The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.

Is Al Batin within your service area?

Yes, Al Batin is one of the areas we work in, as are Abu Musa Al Ashari, Al Fayha (near Hafar Al-Batin) and Fulaij. To start, call us or message us on WhatsApp.

Is the waterproof layer affected by salty soil?

Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.

Nearby areas

Foundation waterproofing near Al Batin

We also work near Al Batin, in Abu Musa Al Ashari, Al Fayha (near Hafar Al-Batin) and Fulaij.

Other services in the area

More services in Al Batin

Two workers on the roof insulating around an AC unit

Tell us about your site in Al Batin
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp