Abraj Al AzlContracting
Call العربية
Excavated villa foundation wall coated with black bitumen and a protection board

Foundation waterproofing in Al Aziziyah Second District

Sealed before backfill

Waterproofing for foundations and below-ground walls with bitumen and membranes

+966 54 311 2066
The service in your area

Foundation waterproofing in Al Aziziyah Second District

Foundation waterproofing in Al Aziziyah Second District starts with photos of the base and underground walls sent by call or WhatsApp. The district has villas and varied residential blocks whose foundations may be affected by damp, requiring strong and effective waterproofing.

Al Aziziyah Second District spans both old and new villas and residential blocks, so foundation conditions vary by building age and construction quality. Concrete foundations in older buildings may show cracks and seepage at corners, joints and openings; newer ones may suffer mild seasonal dampness. Lower-floor walls may stay wet from water pooling around the building base. Bitumen and waterproof membranes prevent water and damp entry and protect concrete from deterioration. Photos sent via WhatsApp or call show the true foundation state and need for waterproofing.

  • Al Aziziyah Second District is a residential area in the Eastern Province, close to Al Bandariyah District, An Nayfiyah District and Al Hufayrah District, with villas and residential blocks.
  • Foundations in denser residential districts may face higher moisture pressure than less dense areas, especially around existing joints and cracks.
What the service includes

The foundation waterproofing work in Al Aziziyah Second District

  • Treating cracks, pipe openings and joints before waterproofing
  • Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
  • Checking layer continuity at corners, edges and critical points
  • Checking the concrete walls and footing and locating cracks, joints and pipe openings
How we work

This is how we work in Al Aziziyah Second District

1

Send site photos

On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.

2

Prepare the surface

The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.

3

Apply the waterproof layer

Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.

4

Protection boards then backfill

Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.

What sets us apart

Why Abraj Al Azl?

The structure kept from moisture and saltsConstant moisture attacks the reinforcement and weakens the concrete over time, and the waterproof layer cuts that off from the start.

Your request from Al Aziziyah Second District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Aziziyah Second District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on foundation waterproofing in Al Aziziyah Second District

Does damp in a villa's foundation in Al Aziziyah Second mean the villa needs demolition and rebuilding?

No, in the vast majority of cases it is not. The concrete foundation is usually sound and the problem is old or absent waterproofing. Photos show whether the concrete itself is intact, and then new waterproofing is the sufficient solution.

Can an apartment block's foundation be waterproofed without disrupting residents and activities inside?

Yes, most waterproofing work is done externally without evacuating the building. We coordinate with the owner to determine the best and least disruptive method, and initial photos help us plan with you what can be done.

What decides the cost of foundation waterproofing?

The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.

Do you cover Al Aziziyah Second District?

Yes. We serve Al Aziziyah Second District and nearby areas such as Al Bandariyah District, An Nayfiyah District and Al Hufayrah District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What is the difference between waterproofing foundations in a new build and in an existing building?

In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.

Is the waterproof layer affected by salty soil?

Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.

Nearby areas

The same service in nearby areas

We also work near Al Aziziyah Second District, in Al Bandariyah District, An Nayfiyah District and Al Hufayrah District.

Other services in the area

More services in Al Aziziyah Second District

Two workers on the roof insulating around an AC unit

We start with you in Al Aziziyah Second District
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp