
Foundation waterproofing in Al Anwar (near Dammam)
We waterproof foundations and below-ground walls in Al Anwar using bitumen and membranes, and the work starts with photos of the excavation or the exposed wall sent by call or WhatsApp. The district holds houses and compounds close to Al Amal, Al Urubah and Al Manar, and the treatment depends on how deep the foundation sits and what condition the wall is in.
Al Anwar mixes detached villas with mid-rise residential blocks, and some have a ground floor or a small basement below ground level. Buried concrete walls stay exposed to soil pressure and moisture seeping in from outside, so damp often shows at the base of inner walls and on the first floor. The type of layer is decided once we see the actual condition, because the need differs from one building to the next.
- Al Anwar is a residential district in Al Khubar, Eastern Province, lying close to Al Amal and Al Urubah.
- A buried wall carries constant pressure from outside, so the face against the soil is treated before backfilling.
The main items of foundation waterproofing in Al Anwar (near Dammam)
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
- Treating cracks, pipe openings and joints before waterproofing
- Fixing protection boards over the waterproof layer before backfill
- Checking the concrete walls and footing and locating cracks, joints and pipe openings
This is how we work in Al Anwar (near Dammam)
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
The structure kept from moisture and saltsConstant moisture attacks the reinforcement and weakens the concrete over time, and the waterproof layer cuts that off from the start.
Your request from Al Anwar (near Dammam) comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Al Anwar (near Dammam) and around itIncluding Al Amal (near Dhahran), Al Urubah (near Dhahran) and Al Manar (near Dammam), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Common questions on foundation waterproofing in Al Anwar (near Dammam)
Can the foundations of an existing building in Al Anwar be waterproofed after construction?
In many cases yes, once the buried wall is exposed and cleaned. The photos show whether it is feasible, and if the excavation has to be extensive we will say so before starting.
What signs appear on a wall when the foundation leaks in Al Anwar?
Usually damp patches at the base of inner walls and peeling paint near floor level. Photos help tell rising moisture from the foundation apart from water coming down from above.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
Is the waterproof layer affected by salty soil?
Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.
What do the protection boards do over the waterproof layer?
Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.
Do you offer foundation waterproofing in Al Anwar (near Dammam)?
Yes. Al Anwar (near Dammam) is within our service area in the Eastern Province, and we also work in Al Amal (near Dhahran), Al Urubah (near Dhahran) and Al Manar (near Dammam). Call us or send photos of the spot on WhatsApp.
Foundation waterproofing near Al Anwar (near Dammam)
We also work near Al Anwar (near Dammam), in Al Amal (near Dhahran), Al Urubah (near Dhahran) and Al Manar (near Dammam).
More services in Al Anwar (near Dammam)



