Abraj Al AzlContracting
Call العربية
Excavated villa foundation wall coated with black bitumen and a protection board

Foundation waterproofing in Second Industrial Area

Sealed before backfill

Waterproofing for foundations and below-ground walls with bitumen and membranes

+966 54 311 2066
The service in your area

Foundation waterproofing in Second Industrial Area

Foundation waterproofing in the Second Industrial Area starts with photos of the facility and of the walls that meet the ground, sent by call or WhatsApp. The area holds factory buildings, warehouses and commercial premises with large foundations in direct contact with soil.

Industrial buildings here generally have wide foundations and concrete or metal walls that extend below ground, and some floors are pressed by water from beneath. When water sits high or pools around the foundation, damp appears in the internal walls and floors. The treatment varies with the depth of the base and how far it contacts soil, and the photos establish these before any method is chosen.

  • The Second Industrial Area is in Dammam, in the Eastern Province, near the First and Third Industrial Areas.
  • An industrial floor extending below ground faces water pressure from underneath, so its waterproofing must resist pressure, not just contact.
What the service includes

The foundation waterproofing work in Second Industrial Area

  • Treating cracks, pipe openings and joints before waterproofing
  • Cleaning the surface and removing loose material and oil
  • Fixing protection boards over the waterproof layer before backfill
  • Checking the concrete walls and footing and locating cracks, joints and pipe openings
How we work

From first contact to the finished job in Second Industrial Area

1

Send site photos

On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.

2

Prepare the surface

The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.

3

Apply the waterproof layer

Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.

4

Protection boards then backfill

Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.

What sets us apart

Why Abraj Al Azl?

The structure kept from moisture and saltsConstant moisture attacks the reinforcement and weakens the concrete over time, and the waterproof layer cuts that off from the start.

We serve Second Industrial Area and around itIncluding First Industrial Area, Third Industrial Area and Industrial Area, as part of our work across the Eastern Province.

Start from Second Industrial Area with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Second Industrial Area

Do you waterproof foundations of large warehouses in the Second Industrial Area?

Yes, we serve the area. Send photos of the foundations and ground walls, plus a rough plan if you have one, so we can agree the scope and a suitable method for the wall length and base depth.

Is external waterproofing enough for industrial foundations?

It depends on the site. External membrane protects the buried face, while internal damp calls for checking the floor and joints. The photos will show whether external work alone is enough or internal treatment is needed too.

What is the difference between waterproofing foundations in a new build and in an existing building?

In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.

Do you offer foundation waterproofing in Second Industrial Area?

Yes. Second Industrial Area is within our service area in the Eastern Province, and we also work in First Industrial Area, Third Industrial Area and Industrial Area. Call us or send photos of the spot on WhatsApp.

What decides the cost of foundation waterproofing?

The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.

What do the protection boards do over the waterproof layer?

Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: First Industrial Area, Third Industrial Area and Industrial Area.

Other services in the area

More services in Second Industrial Area

Two workers on the roof insulating around an AC unit

We start with you in Second Industrial Area
with one call

Describe the problem and where it is in Second Industrial Area, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp