
Foundation waterproofing in First Industrial (near Dammam)
Foundation waterproofing in First Industrial starts with photos of the building base, the yard edge and any damp on lower walls, sent by call or WhatsApp. We serve First Industrial, a district in the Eastern Province, where workshops, warehouses and light industrial units stand on large concrete slabs.
First Industrial is made up of workshops, warehouses and light industrial units, many with large concrete yards and loading areas. Foundations in these buildings carry heavy equipment and frequent vehicle movement, so the junction between the slab and the outer wall is under considerable stress. Wash water, spillage and surface runoff can gather against the base of walls, and wide slabs may hold water along their edges. Photos of the yard edge, the wall base and any drain or channel help us judge whether a bitumen layer or a membrane is the better match.
- First Industrial is a district in the Eastern Province, close to Al Basatin, Al Muntazah and An Nahdah.
- Washing water and spillage run towards workshop walls, so the junction with the yard needs the closest attention.
The scope of the work in First Industrial (near Dammam)
- Fixing protection boards over the waterproof layer before backfill
- Cleaning the surface and removing loose material and oil
- Checking the concrete walls and footing and locating cracks, joints and pipe openings
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
From first contact to the finished job in First Industrial (near Dammam)
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
Start from First Industrial (near Dammam) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from First Industrial (near Dammam) comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in First Industrial (near Dammam)
Can a warehouse floor edge be waterproofed without lifting the slab?
Often the edge and joint can be treated from the surface, depending on the slab condition and what is stored on it or driven over it. Send photos of the joint and floor edge, and we will say whether the work can be done from that side alone.
Do you treat foundations beside loading bays in First Industrial?
Yes, we serve First Industrial and can look at loading bay foundations from photos. Please include vehicle traffic and any washing or drainage running beside the wall, as these decide which membrane suits the base.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
What is the difference between waterproofing foundations in a new build and in an existing building?
In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.
Is the waterproof layer affected by salty soil?
Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.
Do you offer foundation waterproofing in First Industrial (near Dammam)?
Yes. First Industrial (near Dammam) is within our service area in the Eastern Province, and we also work in Al Basatin (near Dammam), Al Muntazah (near Dammam) and An Nahdah (near Dammam). Call us or send photos of the spot on WhatsApp.
We also offer it in neighbouring areas
If the site is outside First Industrial (near Dammam), the same service is available in Al Basatin (near Dammam), Al Muntazah (near Dammam) and An Nahdah (near Dammam).
More services in First Industrial (near Dammam)



