Abraj Al AzlContracting
Call العربية
Worker brushing cold bitumen onto a concrete surface with a long brush

Cold bitumen waterproofing in Ash Shahba

Waterproofing without a flame

Cold-applied bitumen coating by brush or roller, for foundations, bathrooms, planters and roofs

+966 54 311 2066
The service in your area

Cold bitumen waterproofing in Ash Shahba

Cold bitumen waterproofing in Ash Shahba begins with photos sent over WhatsApp or by phone. The district contains multi-storey homes and villas whose foundations need protection from soil damp and the nearby coastal climate.

Ash Shahba, near At Tubi and Al Qudayh, mixes residential homes with varying foundation depths. Groundwater damp and rain affect lower walls and floors, especially in older buildings or those on damp soil. Cold bitumen provides a flexible barrier tolerating minor foundation movement and repeated damp. Photos identify water paths and cracks to apply the coating effectively.

  • Ash Shahba is a district in the Eastern Province, located near At Tubi and Al Qudayh, containing multiple residential properties.
  • Houses near coastal areas often suffer high damp in their foundations, especially during winter and rare heavy rainfall.
What the service includes

The cold bitumen waterproofing work in Ash Shahba

  • Adding the protective layer on sun-exposed surfaces once dry
  • Checking the surface and locating cracks and weak points
  • Cleaning the surface and removing loose material and grease
  • Treating cracks and joints before application
How we work

How we carry out cold bitumen waterproofing in Ash Shahba

1

Send photos of the area

On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.

2

Clean and prepare the surface

The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.

3

Apply the waterproof coating

The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.

4

Cure and protective layer

The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.

What sets us apart

Why Abraj Al Azl?

No flame in confined spacesBrush and roller application makes the coating suitable for bathrooms, planters and any space where a flame is not safe.

Start from Ash Shahba with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Ash Shahba and around itIncluding At Tubi (near Qatif), Al Qudayh (near Qatif) and Al Qadih (near Al Awwamiyah), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on cold bitumen waterproofing in Ash Shahba

Does cold bitumen tolerate continuous damp in a house foundation in Ash Shahba?

Yes, cold bitumen is designed to withstand continuous damp and periodic drying. However, the surface must be cleaned well and large cracks repaired before application. Photos help us assess the damp level and determine how many coats are needed.

Is it advisable to waterproof interior floors with cold bitumen in this district?

Yes, especially if the floor is close to the water table or shows damp marks. Cold bitumen applies easily to floors and forms an effective barrier. Send us photos of the floor and any damp signs so we can assess the need and method with you.

Can cold bitumen be applied to freshly poured concrete?

It is not applied immediately after pouring. The concrete must complete its cure and dry fully first. Internally damp concrete prevents the coating from bonding and traps moisture beneath it, reducing how well the layer works. Send a photo and tell us when the concrete was poured and we will advise the right time to apply.

What decides the cost of cold bitumen waterproofing?

The area to be waterproofed, its condition regarding cracks and moisture, whether tiles need lifting or prior treatment is needed, ease of access, and whether a protective layer is required. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Can cold bitumen be applied over old bathroom tiles?

In some cases yes, if the tiles are firm, clean and free of grease the coating bonds over them and closes the joints. If the tiles are loose or there is moisture beneath them, they are lifted first and the concrete surface is treated. Send photos of the bathroom and we will say which way suits.

Is Ash Shahba within your service area?

Yes, Ash Shahba is one of the areas we work in, as are At Tubi (near Qatif), Al Qudayh (near Qatif) and Al Qadih (near Al Awwamiyah). To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Ash Shahba, the same service is available in At Tubi (near Qatif), Al Qudayh (near Qatif) and Al Qadih (near Al Awwamiyah).

Other services in the area

More services in Ash Shahba

Worker rolling the white insulation layer onto a roof

Tell us about your site in Ash Shahba
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp