Abraj Al AzlContracting
Call العربية
Worker brushing cold bitumen onto a concrete surface with a long brush

Cold bitumen waterproofing in Al Thulaythiyah District

Waterproofing without a flame

Cold-applied bitumen coating by brush or roller, for foundations, bathrooms, planters and roofs

+966 54 311 2066
The service in your area

Cold bitumen waterproofing in Al Thulaythiyah District

Cold bitumen waterproofing in Al Thulaythiyah District starts with a WhatsApp message containing photos of the location. The district has varied residential and institutional buildings, each needing separate assessment to determine the right protection method against heat and moisture.

Al Thulaythiyah District is a residential and administrative district mixing residential buildings with institutional ones on varying plots. Exposed roofs on houses endure intense heat and show cracks and leaks around joints, gutters and openings. Institutional buildings may need wider protection across roofs, foundations and surrounding areas. Bathrooms, kitchens, foundations, wells and tanks face constant pressure from moisture and heat. Photos determine each location's condition and whether prior repair is needed before application.

  • Al Thulaythiyah District is a residential district in the Eastern Province, near Al Wasitah District, Al Uwaimiriyah District and Al Marbidia District, with residential and institutional buildings.
  • Large institutional and residential buildings need systematic cold bitumen application covering wide areas and different roof and foundation angles.
What the service includes

The main items of cold bitumen waterproofing in Al Thulaythiyah District

  • Adding the protective layer on sun-exposed surfaces once dry
  • Treating cracks and joints before application
  • Applying the waterproof coating by brush or roller over the whole surface
  • Cleaning the surface and removing loose material and grease
How we work

The steps of cold bitumen waterproofing in Al Thulaythiyah District

1

Send photos of the area

On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.

2

Clean and prepare the surface

The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.

3

Apply the waterproof coating

The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.

4

Cure and protective layer

The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.

What sets us apart

Why Abraj Al Azl?

Penetrates pores and hairline cracksThe liquid body lets the material enter pores and hairline cracks in the concrete before it sets, forming a seal both inside and at the surface.

We serve Al Thulaythiyah District and around itIncluding Al Wasitah District, Al Uwaimiriyah District and Al Marbidia District, as part of our work across the Eastern Province.

Start from Al Thulaythiyah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about cold bitumen waterproofing in Al Thulaythiyah District

Can a large institutional building in the district be waterproofed with cold bitumen?

Yes, cold bitumen suits large buildings when applied systematically. Large area and varied angles need careful planning, and photos will show the site dimensions and condition to determine the method.

Can tanks and wells at an institutional building be treated the same way?

Treatment varies by tank or well type and material. Send separate photos of each element so we can determine the right method; a concrete tank may need different treatment than a well or external walls.

What decides the cost of cold bitumen waterproofing?

The area to be waterproofed, its condition regarding cracks and moisture, whether tiles need lifting or prior treatment is needed, ease of access, and whether a protective layer is required. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Can cold bitumen be applied over old bathroom tiles?

In some cases yes, if the tiles are firm, clean and free of grease the coating bonds over them and closes the joints. If the tiles are loose or there is moisture beneath them, they are lifted first and the concrete surface is treated. Send photos of the bathroom and we will say which way suits.

Do you cover Al Thulaythiyah District?

Yes. We serve Al Thulaythiyah District and nearby areas such as Al Wasitah District, Al Uwaimiriyah District and Al Marbidia District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Can cold bitumen be applied to freshly poured concrete?

It is not applied immediately after pouring. The concrete must complete its cure and dry fully first. Internally damp concrete prevents the coating from bonding and traps moisture beneath it, reducing how well the layer works. Send a photo and tell us when the concrete was poured and we will advise the right time to apply.

Nearby areas

The same service in nearby areas

We also offer cold bitumen waterproofing in Al Wasitah District, Al Uwaimiriyah District and Al Marbidia District, among the closest areas to Al Thulaythiyah District.

Other services in the area

More services in Al Thulaythiyah District

Worker rolling the white insulation layer onto a roof

Cold bitumen waterproofing in Al Thulaythiyah District?
Call us now

Describe the problem and where it is in Al Thulaythiyah District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp