Abraj Al AzlContracting
Call العربية
Worker brushing cold bitumen onto a concrete surface with a long brush

Cold bitumen waterproofing in Al Naseem

Waterproofing without a flame

Cold-applied bitumen coating by brush or roller, for foundations, bathrooms, planters and roofs

+966 54 311 2066
The service in your area

Cold bitumen waterproofing in Al Naseem

Cold bitumen waterproofing in Al Naseem covers foundations, bathrooms, planters and roofs, applied by brush or roller. Send site photos by call or WhatsApp and we will agree the right method with you.

Al Naseem is a residential district of villas and mid-sized buildings, with a varied mix of open roofs and external planters. Roofs exposed to long hours of sun need a clean, dry surface before application, while foundations call for careful excavation and preparation. The photos will show which elements of your building need treatment first.

  • Al Naseem is a residential district in Al Khobar, in the Eastern Province, close to Qurtubah, Al Ghadir and Al Khisab.
  • Open roofs in the Eastern Province are stressed by summer heat, so the condition of the surface before application matters.
What the service includes

The scope of the work in Al Naseem

  • Cleaning the surface and removing loose material and grease
  • Treating cracks and joints before application
  • Closing the waterproofing at the parapet, drain openings and AC bases
  • Checking the surface and locating cracks and weak points
How we work

From first contact to the finished job in Al Naseem

1

Send photos of the area

On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.

2

Clean and prepare the surface

The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.

3

Apply the waterproof coating

The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.

4

Cure and protective layer

The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.

What sets us apart

Why Abraj Al Azl?

No flame in confined spacesBrush and roller application makes the coating suitable for bathrooms, planters and any space where a flame is not safe.

Al Naseem is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Naseem and around itIncluding Qurtubah (near Inak), Al Ghadir and Al Khisab, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about cold bitumen waterproofing in Al Naseem

What should be prepared before waterproofing a roof in Al Naseem?

Dust and loose cracking should be removed and the surface left dry. Send photos of the roof and we will tell you what needs cleaning or repair before we start.

Does cold bitumen suit planters in Al Naseem?

Often yes, as it is easily brushed onto planters. The photos will show whether the planter suits this material and what it needs beforehand.

What decides the cost of cold bitumen waterproofing?

The area to be waterproofed, its condition regarding cracks and moisture, whether tiles need lifting or prior treatment is needed, ease of access, and whether a protective layer is required. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Does cold bitumen need a protective layer on a roof?

On surfaces exposed to direct sun, yes. Intense heat and ultraviolet light damage bare cold bitumen over time. A suitable protective layer, tiles or a thermal coating is added on top, depending on the roof and how it is used. In foundations and bathrooms that will be finished over, no extra protection is needed because the coating will be covered.

What should I send you from Al Naseem?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Naseem, and we will work out the next step with you.

Can cold bitumen be applied to freshly poured concrete?

It is not applied immediately after pouring. The concrete must complete its cure and dry fully first. Internally damp concrete prevents the coating from bonding and traps moisture beneath it, reducing how well the layer works. Send a photo and tell us when the concrete was poured and we will advise the right time to apply.

Nearby areas

Cold bitumen waterproofing near Al Naseem

Nearby areas we also cover: Qurtubah (near Inak), Al Ghadir and Al Khisab.

Other services in the area

More services in Al Naseem

Worker rolling the white insulation layer onto a roof

Your first step in Al Naseem:
a call or a WhatsApp message

Describe the problem and where it is in Al Naseem, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp