
Cold bitumen waterproofing in Al Muruj (near Qaryah al Ulya)
Cold bitumen waterproofing in Al Muruj starts with a photo of your site, sent by call or WhatsApp. This part of Al Muruj, near Qaryah al Ulya, Az Zuhur and Ar Rawdah, has houses with roofs, foundations and basins that need protection from damp.
This part of Al Muruj is mostly private houses with exposed roofs, and foundations often sit against damp soil in courtyards. An exposed roof needs a continuous cold bitumen layer to guard against standing water, while a foundation needs a coat that resists rising damp. The photos show which spots need more than one pass.
- Al Muruj is a residential district in Riyadh, and this part lies near Qaryah al Ulya, Az Zuhur and Ar Rawdah, with private houses and exposed roofs.
- Exposed roofs collect standing water after rain, and constant ponding weakens the coating over time.
The cold bitumen waterproofing work in Al Muruj (near Qaryah al Ulya)
- Checking the surface and locating cracks and weak points
- Adding the protective layer on sun-exposed surfaces once dry
- Cleaning the surface and removing loose material and grease
- Applying the waterproof coating by brush or roller over the whole surface
The stages of the work in Al Muruj (near Qaryah al Ulya)
Send photos of the area
On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.
Clean and prepare the surface
The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.
Apply the waterproof coating
The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.
Cure and protective layer
The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.
Why Abraj Al Azl?
No flame in confined spacesBrush and roller application makes the coating suitable for bathrooms, planters and any space where a flame is not safe.
Start from Al Muruj (near Qaryah al Ulya) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Al Muruj (near Qaryah al Ulya) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Common questions on cold bitumen waterproofing in Al Muruj (near Qaryah al Ulya)
Is cold bitumen suitable for an exposed house roof in Al Muruj?
It suits many cases when the structure is sound. The photos decide whether an exposed roof needs more than one coat, and we then propose the right plan.
Is a foundation against courtyard soil in Al Muruj treated?
Yes, the foundation is coated with cold bitumen to block rising damp. Send a photo of the wall and courtyard so the scope is clear.
Do you offer cold bitumen waterproofing in Al Muruj (near Qaryah al Ulya)?
Yes. Al Muruj (near Qaryah al Ulya) is within our service area in the Eastern Province, and we also work in Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya). Call us or send photos of the spot on WhatsApp.
What decides the cost of cold bitumen waterproofing?
The area to be waterproofed, its condition regarding cracks and moisture, whether tiles need lifting or prior treatment is needed, ease of access, and whether a protective layer is required. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.
Does cold bitumen need a protective layer on a roof?
On surfaces exposed to direct sun, yes. Intense heat and ultraviolet light damage bare cold bitumen over time. A suitable protective layer, tiles or a thermal coating is added on top, depending on the roof and how it is used. In foundations and bathrooms that will be finished over, no extra protection is needed because the coating will be covered.
Can cold bitumen be applied to freshly poured concrete?
It is not applied immediately after pouring. The concrete must complete its cure and dry fully first. Internally damp concrete prevents the coating from bonding and traps moisture beneath it, reducing how well the layer works. Send a photo and tell us when the concrete was poured and we will advise the right time to apply.
Areas near Al Muruj (near Qaryah al Ulya)
We also offer cold bitumen waterproofing in Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya), among the closest areas to Al Muruj (near Qaryah al Ulya).
More services in Al Muruj (near Qaryah al Ulya)



