Abraj Al AzlContracting
Call العربية
Worker brushing cold bitumen onto a concrete surface with a long brush

Cold bitumen waterproofing in Al Mirqab District

Waterproofing without a flame

Cold-applied bitumen coating by brush or roller, for foundations, bathrooms, planters and roofs

+966 54 311 2066
The service in your area

Cold bitumen waterproofing in Al Mirqab District

Cold bitumen waterproofing in Al Mirqab District begins with a photo of the roof, foundation or bathroom sent by call or WhatsApp. The district has residential buildings of various ages, many needing protection from leaks and damp.

Al Mirqab District has mixed residential buildings, some older and some newer, all affecting roof and foundation condition. Flat roofs in these buildings often suffer water pooling and leaks at joints, and foundations may be damp from the ground. Cold bitumen is applied easily to existing surfaces without heating or heavy equipment. Photos determine the damage level and areas needing protection.

  • Al Mirqab District is a district in the Eastern Province near Juba, Al Marbidia and Ladhah districts, with mixed residential buildings.
  • A flat roof can trap water in low spots, and cold bitumen prevents that water seeping through the concrete.
What the service includes

The cold bitumen waterproofing work in Al Mirqab District

  • Checking the surface and locating cracks and weak points
  • Closing the waterproofing at the parapet, drain openings and AC bases
  • Adding the protective layer on sun-exposed surfaces once dry
  • Cleaning the surface and removing loose material and grease
How we work

From first contact to the finished job in Al Mirqab District

1

Send photos of the area

On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.

2

Clean and prepare the surface

The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.

3

Apply the waterproof coating

The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.

4

Cure and protective layer

The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.

What sets us apart

Why Abraj Al Azl?

No flame in confined spacesBrush and roller application makes the coating suitable for bathrooms, planters and any space where a flame is not safe.

Al Mirqab District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Mirqab District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about cold bitumen waterproofing in Al Mirqab District

Does cold bitumen stop a flat roof from leaking in Al Mirqab?

Yes, it stops water passing through the concrete. However, if water drainage itself is faulty, drainage pipes may need repair first. Send photos showing where the water leaks.

Is cold bitumen suitable for damp interior walls in a flat in Al Mirqab?

It depends on the source of the damp. If it comes from outside the wall (rain or wet ground), yes; if it is from inside the flat (steam from the bathroom or kitchen), better ventilation may be needed first. Photos will tell us the cause.

What is the difference between cold bitumen and bitumen rolls?

Bitumen rolls are a continuous sheet bonded by heat or adhesive, suited to large open surfaces. Cold bitumen is a liquid applied by brush or roller that reaches tight corners, confined areas and surfaces where rolls do not fit. The right choice depends on the location and the surface condition, and photos help us decide.

How do I request cold bitumen waterproofing in Al Mirqab District?

Call us, or send clear photos of the spot and its location in Al Mirqab District on WhatsApp, and we will work out the next step with you.

Is cold bitumen suitable for outdoor planters and planting beds?

Yes. Cold bitumen is used on the inside walls of planters and planting beds to stop irrigation water reaching the adjacent walls or the surface below. It is applied to the concrete or tiles after cleaning, left to dry before the planter is filled with soil. Good ventilation of the space during application is important.

Does cold bitumen need a protective layer on a roof?

On surfaces exposed to direct sun, yes. Intense heat and ultraviolet light damage bare cold bitumen over time. A suitable protective layer, tiles or a thermal coating is added on top, depending on the roof and how it is used. In foundations and bathrooms that will be finished over, no extra protection is needed because the coating will be covered.

Nearby areas

The same service in nearby areas

We also offer cold bitumen waterproofing in Juba District, Al Marbidia District and Ladhah District, among the closest areas to Al Mirqab District.

Other services in the area

More services in Al Mirqab District

Worker rolling the white insulation layer onto a roof

Tell us about your site in Al Mirqab District
and we will plan the next step with you

Describe the problem and where it is in Al Mirqab District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp