
Cold bitumen waterproofing in Al Jazirah
We serve Al Jazirah in Al Ahsa with cold bitumen waterproofing for foundations, bathrooms, planters and roofs, applied by brush or roller. Send photos of the building by call or WhatsApp to settle the right method with you.
Al Jazirah combines traditional houses with newer buildings, and roof and planter sizes vary from site to site. Larger planters need attention at their joints, and older foundations need checking for rising damp. Bathrooms are usually brushed onto the floor and the walls meeting the ground.
- Al Jazirah is a district in Al Ahsa in the Eastern Province, close to Al Wadiah, Al Khamisah and Kuwaikib.
- Larger planters need care at their joints, because water seeps through joints before it shows on the wall.
What the service covers in Al Jazirah
- Closing the waterproofing at the parapet, drain openings and AC bases
- Checking the surface and locating cracks and weak points
- Cleaning the surface and removing loose material and grease
- Treating cracks and joints before application
The stages of the work in Al Jazirah
Send photos of the area
On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.
Clean and prepare the surface
The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.
Apply the waterproof coating
The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.
Cure and protective layer
The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.
Why Abraj Al Azl?
Penetrates pores and hairline cracksThe liquid body lets the material enter pores and hairline cracks in the concrete before it sets, forming a seal both inside and at the surface.
Start from Al Jazirah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Al Jazirah comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Before you book cold bitumen waterproofing in Al Jazirah
Does cold waterproofing suit traditional houses in Al Jazirah?
It suits many of them once floors and walls are prepared and cracks repaired. The photos show the materials and condition so we can say whether this option fits your home.
How is a large planter in Al Jazirah treated?
The planter, its walls and its joints are checked first, then bitumen is brushed onto the inner faces exposed to water. The photos show where the sensitive joints are.
Can cold bitumen be applied over old bathroom tiles?
In some cases yes, if the tiles are firm, clean and free of grease the coating bonds over them and closes the joints. If the tiles are loose or there is moisture beneath them, they are lifted first and the concrete surface is treated. Send photos of the bathroom and we will say which way suits.
What should I send you from Al Jazirah?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jazirah, and we will work out the next step with you.
What is the difference between cold bitumen and bitumen rolls?
Bitumen rolls are a continuous sheet bonded by heat or adhesive, suited to large open surfaces. Cold bitumen is a liquid applied by brush or roller that reaches tight corners, confined areas and surfaces where rolls do not fit. The right choice depends on the location and the surface condition, and photos help us decide.
Can cold bitumen be applied to freshly poured concrete?
It is not applied immediately after pouring. The concrete must complete its cure and dry fully first. Internally damp concrete prevents the coating from bonding and traps moisture beneath it, reducing how well the layer works. Send a photo and tell us when the concrete was poured and we will advise the right time to apply.
Areas near Al Jazirah
If the site is outside Al Jazirah, the same service is available in Al Wadiah, Al Khamisah and Kuwaikib.
More services in Al Jazirah



