
Cold bitumen waterproofing in First Industrial Area
Cold bitumen waterproofing in the First Industrial Area starts with a photo of the roof or outer wall, sent by call or WhatsApp. The area has warehouses and industrial buildings of varying sizes, whose roofs need protection from leaks and damp.
The First Industrial Area spans warehouses, factories and service buildings, many with exposed metal or concrete roofs. Metal roofs face sun heat, expansion and contraction, while concrete roofs show cracks and leaks. Cold bitumen bonds to both metal and concrete and is brushed on without excavation or structural change. Photos show the roof's condition, type and the extent of leaks and cracks before any method is chosen.
- The First Industrial Area is an industrial district in the Eastern Province, near Al Lualu, Al Huwaylat and Ash Shati.
- Metal roofs in industrial areas face severe heat and may leak at joints and openings.
The scope of the work in First Industrial Area
- Adding the protective layer on sun-exposed surfaces once dry
- Cleaning the surface and removing loose material and grease
- Treating cracks and joints before application
- Applying the waterproof coating by brush or roller over the whole surface
How we carry out cold bitumen waterproofing in First Industrial Area
Send photos of the area
On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.
Clean and prepare the surface
The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.
Apply the waterproof coating
The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.
Cure and protective layer
The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.
Why Abraj Al Azl?
Penetrates pores and hairline cracksThe liquid body lets the material enter pores and hairline cracks in the concrete before it sets, forming a seal both inside and at the surface.
First Industrial Area is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve First Industrial Area and around itIncluding Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan), as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about cold bitumen waterproofing in First Industrial Area
Does cold bitumen stick to metal warehouse roofs?
Yes, cold bitumen bonds firmly to clean, dry metal. Rust and dirt must be removed first, and photos show whether the surface is ready or needs cleaning.
Does cold bitumen repair leaks from roof joints?
Cold bitumen is brushed over joints and cracks, fills them and seals the leak. But if the joint is loose or deeply cracked, it may need deeper repair first. Send photos of the leak so we can set the right approach.
Does cold bitumen need a protective layer on a roof?
On surfaces exposed to direct sun, yes. Intense heat and ultraviolet light damage bare cold bitumen over time. A suitable protective layer, tiles or a thermal coating is added on top, depending on the roof and how it is used. In foundations and bathrooms that will be finished over, no extra protection is needed because the coating will be covered.
Is cold bitumen suitable for outdoor planters and planting beds?
Yes. Cold bitumen is used on the inside walls of planters and planting beds to stop irrigation water reaching the adjacent walls or the surface below. It is applied to the concrete or tiles after cleaning, left to dry before the planter is filled with soil. Good ventilation of the space during application is important.
Can cold bitumen be applied to freshly poured concrete?
It is not applied immediately after pouring. The concrete must complete its cure and dry fully first. Internally damp concrete prevents the coating from bonding and traps moisture beneath it, reducing how well the layer works. Send a photo and tell us when the concrete was poured and we will advise the right time to apply.
How do I request cold bitumen waterproofing in First Industrial Area?
Call us, or send clear photos of the spot and its location in First Industrial Area on WhatsApp, and we will work out the next step with you.
Areas near First Industrial Area
If the site is outside First Industrial Area, the same service is available in Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan).
More services in First Industrial Area



