Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Yakrub

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Yakrub

Bathroom waterproofing in Yakrub starts with photos of the bathroom space sent to us by call or WhatsApp. The hamlet has small scattered houses and villas, and the bathroom may be in a traditional or modern house.

Yakrub is a small hamlet with houses of different ages and designs. An older bathroom may have cracks or leaks at the joints between walls and floor, while a newer one needs preventive waterproofing before or after cladding. Interior moisture from daily use builds up easily in small spaces and may affect adjoining walls. Photos pinpoint the problem so we can choose the right treatment.

  • Yakrub is a small hamlet in the Eastern Province near Al Kidadiyah, Fudah and Qusayba', with small houses and villas.
  • A small bathroom in a rural house heats up and stays damp for long after use, which increases its need for tight waterproofing.
What the service includes

What the service covers in Yakrub

  • Cleaning the surface and treating hairline cracks and pipe entries
  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Closing the drain opening ring and the bathroom door threshold
  • Applying a continuous waterproof layer rising at walls and corners
How we work

This is how we work in Yakrub

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Start from Yakrub with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Yakrub comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing in Yakrub

Do you waterproof new bathrooms before tiling in Yakrub?

Yes, this is best. Waterproofing the floor and walls before tiles stops water seeping into the layers below and extends the life of the building. Send photos of the empty space and tell us about the floor and walls.

What are the signs of water leaking under bathroom tiles?

Tiles that are always wet, adjoining walls becoming damp, and bad smells may appear. These mean water is leaking under the tiles to the layers below. Photos help us pinpoint the damage clearly.

What should I send you from Yakrub?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Yakrub, and we will work out the next step with you.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

Nearby areas

The same service in nearby areas

If the site is outside Yakrub, the same service is available in Al Kidadiyah (near Ayn Dar), Fudah and Qusayba'.

Other services in the area

More services in Yakrub

Two workers on the roof insulating around an AC unit

Bathroom waterproofing in Yakrub?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp