Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Yakrub

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Yakrub

Bathroom waterproofing before tiling in Yakrub begins with photos you send by call or WhatsApp. We apply a continuous waterproof membrane to protect the bathroom from water seepage before tiles and adhesive are laid.

The small village of Yakrub has scattered houses and villas, many built years ago or currently undergoing renovation. Their foundations vary in age and material, and may carry cracks or accumulated moisture. Proper waterproofing before tiling protects against new seepage and extends the building's life. Photos reveal the state of base, walls and pipes to determine the best approach.

  • Yakrub is a small hamlet in the Eastern Province, near Al Kidadiyah, Fudah and Qusayba', with scattered houses and villas.
  • Bathrooms in older houses often show wall dampness, and a waterproof membrane blocks new water seepage.
What the service includes

What we do for you in Yakrub

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

This is how we work in Yakrub

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Yakrub with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bathroom waterproofing before tiling in YakrubWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Yakrub

Can a bathroom be waterproofed without removing old tiles?

No, the waterproof membrane must be applied to a clean base before new tiles. Old tiles and materials must be removed first. Photos show what is underneath the existing tiles.

What if dampness appears in walls next to the bathroom?

Dampness in adjacent walls needs separate treatment from bathroom waterproofing. Photos show the source of moisture and we advise on the steps appropriate for your case.

How do I request bathroom waterproofing before tiling in Yakrub?

Call us, or send clear photos of the spot and its location in Yakrub on WhatsApp, and we will work out the next step with you.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

The same service in nearby areas

We also work near Yakrub, in Al Kidadiyah (near Ayn Dar), Fudah and Qusayba'.

Other services in the area

More services in Yakrub

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Yakrub:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp