Abraj Al AzlContracting
Call العربية
Worker applying a waterproof coat on a bare kitchen floor around the drain

Kitchen waterproofing in Qasr Al Khalij

Sealed before tiling

Waterproofing for kitchen floors, wall bases, drains and dishwasher outlets

+966 54 311 2066
The service in your area

Kitchen waterproofing in Qasr Al Khalij

We waterproof kitchens in the Qasr Al Khalij district of Al Khobar, and the work starts with photos of the floor, the wall bases and the dishwasher outlet, sent by call or WhatsApp. Problems here usually concentrate at the drains and where the floor meets the wall.

The district has villas and older houses alongside newer homes, with many open-plan kitchens and tiled floors. In older kitchens the wall bases weaken over time, and stains usually appear at the drains and behind the dishwasher. The method depends on the kitchen layout and the floor finish, which the photos will help us assess before any decision.

  • Qasr Al Khalij is a residential district in Al Khobar in the Eastern Province, lying close to Tihamah, Al Muntazah and An Nahdah.
  • Drains and wall bases are the points where water most often gets through in kitchens, so they are checked first.
What the service includes

The kitchen waterproofing work in Qasr Al Khalij

  • Applying a continuous waterproof layer that turns up at the wall bases
  • Checking the floor, corners, drain opening and dishwasher outlet
  • Wrapping pipe openings and the dishwasher outlet in the waterproof layer
  • Cleaning the surface and treating cracks and joints
How we work

How we carry out kitchen waterproofing in Qasr Al Khalij

1

Send photos of the kitchen

On WhatsApp: photos of the floor, the drain, the wall-to-floor corner, the dishwasher outlet and any damp stains, so we can read the stage and decide the right treatment.

2

Prepare the surface

The surface is cleaned of dust and old render residue, cracks and joints are treated, and the corners between the floor and the walls are sealed before any layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases, closes around the drain, the dishwasher outlet and the pipe openings, depending on the surface type and the material that suits it.

4

Dry, then screed and tile

The layer is left to dry and cure, then the screed or levelling coat goes over it, and finally the tiles, so the waterproofing stays protected from wear and load.

What sets us apart

Why Abraj Al Azl?

The ceiling below stays dryWaterproofing the floor and the wall bases cuts the water's path before it finds a way to the floor below.

Qasr Al Khalij is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Kitchen waterproofing in Qasr Al KhalijWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book kitchen waterproofing in Qasr Al Khalij

Can a tiled kitchen in Qasr Al Khalij be waterproofed?

Often yes, provided the grout and tiles are sound. The photos tell us whether repairing the grout is enough or the drain area needs attention first.

What usually leaks in kitchens in this district?

Moisture usually shows at the wall bases and the dishwasher outlet. The photos show where the problem actually starts.

Which spots in a kitchen leak most often?

The corner between the floor and the wall, the drain edge, the dishwasher outlet opening and the joints around the sink are the common weak points. Water gets in at these spots even when the slab itself is sound.

Should I clear the kitchen before the work?

Yes. Appliances and furniture that can be moved should be cleared from the work area so the waterproofing reaches the full floor and its corners. A built-in dishwasher or a fixed unit is treated around carefully. When the scope of the work is agreed, we go through what needs to be cleared beforehand.

Is Qasr Al Khalij within your service area?

Yes, Qasr Al Khalij is one of the areas we work in, as are Tihamah, Al Muntazah (near Dammam) and An Nahdah (near Dammam). To start, call us or message us on WhatsApp.

Do the kitchen tiles have to be lifted to waterproof it?

If tiles are already down and the leak is under them, lifting the tiles is the better path to reach the surface and lay a proper waterproof layer before new tiles go on. If the surface is already open during renovation, waterproofing goes on before the tiles. Send photos on WhatsApp and we will advise for your situation.

Nearby areas

Areas near Qasr Al Khalij

We also work near Qasr Al Khalij, in Tihamah, Al Muntazah (near Dammam) and An Nahdah (near Dammam).

Other services in the area

More services in Qasr Al Khalij

Worker rolling the white insulation layer onto a roof

Kitchen waterproofing in Qasr Al Khalij?
Call us now

Describe the problem and where it is in Qasr Al Khalij, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp