Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Qasr Al Khalij

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Qasr Al Khalij

We waterproof bathroom floors and wall bases in Qasr Al Khalij with bitumen, applied before the screed and tiles go down. The work starts with photos of the bathroom, sent by call or WhatsApp.

The district has villas and fairly recent homes alongside apartment buildings, and their bathrooms often lack adequate ventilation. In these bathrooms water tends to seep down the wall base before it shows on the floor. Bitumen goes onto the floor and wall base before tiling, and its success depends on a clean, dry surface. The photos show whether this treatment suits your bathroom.

  • Qasr Al Khalij is a residential district in the Eastern Province, close to Tihamah, Al Muntazah and An Nahdah.
  • In a closed bathroom moisture lingers longer, so the lower wall and floor take the most of it.
What the service includes

The scope of the work in Qasr Al Khalij

  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

How we carry out bitumen bathroom waterproofing in Qasr Al Khalij

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Bitumen bathroom waterproofing in Qasr Al KhalijWe choose the method and the materials once we know the condition of the spot.

Start from Qasr Al Khalij with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Qasr Al Khalij

Is bitumen suitable for villa bathrooms in Qasr Al Khalij?

Often yes, for floors and wall bases before tiling. If pipes are leaking, we will tell you and check them first.

When is bitumen applied in a new bathroom in the district?

It goes on after the pipework is fitted and before the screed, because the surface must be clean and dry. Send photos of the bathroom at its current stage.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is Qasr Al Khalij within your service area?

Yes, Qasr Al Khalij is one of the areas we work in, as are Tihamah, Al Muntazah (near Dammam) and An Nahdah (near Dammam). To start, call us or message us on WhatsApp.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Tihamah, Al Muntazah (near Dammam) and An Nahdah (near Dammam).

Other services in the area

More services in Qasr Al Khalij

Pool at night with water jets after waterproofing

Your first step in Qasr Al Khalij:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp