
Kitchen waterproofing in Industrial Area
Kitchen waterproofing in the Industrial Area starts with photos of floors, base walls and drains sent by call or WhatsApp. The district is dedicated to production and service buildings, with kitchens that vary in size and layout.
The Industrial Area houses workshops and small to medium factories, each with kitchens for workers. Concrete floors face constant moisture from washing dishes and cleaning surfaces, and base walls may show damp around pipes and sinks. High indoor temperatures and humidity affect the durability of waterproofing. Your photos identify where the leak is and what damage exists, so the right solution can be picked.
- The Industrial Area is a district in the Eastern Province, close to the Second Industrial Area and the First Industrial Area, with production-focused buildings.
- Workshop kitchens suffer repeated leaks from under sinks and exposed pipes, causing rapid floor wear.
The main items of kitchen waterproofing in Industrial Area
- Checking the floor, corners, drain opening and dishwasher outlet
- Wrapping pipe openings and the dishwasher outlet in the waterproof layer
- Applying a continuous waterproof layer that turns up at the wall bases
- Closing the corners between the floor and the wall bases
The steps of kitchen waterproofing in Industrial Area
Send photos of the kitchen
On WhatsApp: photos of the floor, the drain, the wall-to-floor corner, the dishwasher outlet and any damp stains, so we can read the stage and decide the right treatment.
Prepare the surface
The surface is cleaned of dust and old render residue, cracks and joints are treated, and the corners between the floor and the walls are sealed before any layer goes on.
Apply the waterproof layer
The layer covers the floor and turns up at the wall bases, closes around the drain, the dishwasher outlet and the pipe openings, depending on the surface type and the material that suits it.
Dry, then screed and tile
The layer is left to dry and cure, then the screed or levelling coat goes over it, and finally the tiles, so the waterproofing stays protected from wear and load.
Why Abraj Al Azl?
The ceiling below stays dryWaterproofing the floor and the wall bases cuts the water's path before it finds a way to the floor below.
Kitchen waterproofing in Industrial AreaWe choose the method and the materials once we know the condition of the spot.
We serve Industrial Area and around itIncluding Second Industrial Area, First Industrial Area and Yanbu, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on kitchen waterproofing in Industrial Area
Can a workshop kitchen floor be waterproofed without removing the existing tiles?
It depends on the tile condition and the base beneath it. If the tiles are sound and cracks are small, we treat the cracks and joints directly. Photos show whether the base or tiles need removing.
Do you clean drains before waterproofing an industrial kitchen?
Yes, we examine the drain first via photos and description. If it is blocked or dirty, we clean it before waterproofing to ensure water does not back up. Tell us about drain condition in your photos.
Do the kitchen tiles have to be lifted to waterproof it?
If tiles are already down and the leak is under them, lifting the tiles is the better path to reach the surface and lay a proper waterproof layer before new tiles go on. If the surface is already open during renovation, waterproofing goes on before the tiles. Send photos on WhatsApp and we will advise for your situation.
Should I clear the kitchen before the work?
Yes. Appliances and furniture that can be moved should be cleared from the work area so the waterproofing reaches the full floor and its corners. A built-in dishwasher or a fixed unit is treated around carefully. When the scope of the work is agreed, we go through what needs to be cleared beforehand.
Is Industrial Area within your service area?
Yes, Industrial Area is one of the areas we work in, as are Second Industrial Area, First Industrial Area and Yanbu. To start, call us or message us on WhatsApp.
Does daily kitchen moisture affect the waterproof layer?
Repeated moisture from cooking and washing puts more daily stress on a kitchen floor than most other surfaces. The waterproof material is chosen to suit that continuous use, and closing corners and pipe openings tightly reduces moisture building up at the weak points. A layer covered by screed and tiles stays away from direct wear.
We also offer it in neighbouring areas
We also offer kitchen waterproofing in Second Industrial Area, First Industrial Area and Yanbu, among the closest areas to Industrial Area.
More services in Industrial Area



