
Kitchen waterproofing in Al Matar (near An Nabiyah)
Abraj Al Azl waterproofs kitchens in the Al Matar district of the Eastern Province, starting with photos of the kitchen floor, wall bases and washing machine position sent by call or WhatsApp. The photos show where water is leaking and whether a local repair is enough.
The Al Matar neighbourhoods mix apartments and houses, and kitchens there differ widely in size and finish. Exposed external walls take sun heat and humid air, so damp usually rises from the wall base. The photos clarify whether treatment requires removing an old layer or simply adding a new one.
- Al Matar is a residential district of the Eastern Province, close to Al Amanah, Ash Shrouk and Al Fursan.
- A worn old layer usually has to be removed before a new one is applied, or the new layer will not bond properly.
What we do for you in Al Matar (near An Nabiyah)
- Checking the floor, corners, drain opening and dishwasher outlet
- Wrapping pipe openings and the dishwasher outlet in the waterproof layer
- Applying a continuous waterproof layer that turns up at the wall bases
- Cleaning the surface and treating cracks and joints
This is how we work in Al Matar (near An Nabiyah)
Send photos of the kitchen
On WhatsApp: photos of the floor, the drain, the wall-to-floor corner, the dishwasher outlet and any damp stains, so we can read the stage and decide the right treatment.
Prepare the surface
The surface is cleaned of dust and old render residue, cracks and joints are treated, and the corners between the floor and the walls are sealed before any layer goes on.
Apply the waterproof layer
The layer covers the floor and turns up at the wall bases, closes around the drain, the dishwasher outlet and the pipe openings, depending on the surface type and the material that suits it.
Dry, then screed and tile
The layer is left to dry and cure, then the screed or levelling coat goes over it, and finally the tiles, so the waterproofing stays protected from wear and load.
Why Abraj Al Azl?
Water stays out of the concreteA continuous layer stops the slab absorbing water, protecting the reinforcement from rust and reducing later cracking.
We serve Al Matar (near An Nabiyah) and around itIncluding Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan, as part of our work across the Eastern Province.
Your request from Al Matar (near An Nabiyah) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Matar (near An Nabiyah)
Must old waterproofing be removed in Al Matar kitchens?
It depends on its condition. If the old layer is still firmly bonded it may be built upon; if it is peeling or blistered it is removed first. The photos reveal which.
Do you serve kitchens in apartments in Al Matar?
Yes, we serve Al Matar. In apartments we plan the work so it does not affect neighbours or shared layers, so send photos of the kitchen with its location.
Can the kitchen be waterproofed with the old tiles still in place?
Some liquid waterproof layers can go over existing tiles if they are firm and the joints are sound, but the result is more limited than waterproofing on bare concrete. If the leak has reached below the tiles, lifting them is the better option. Photos help us assess the situation.
Do you cover Al Matar (near An Nabiyah)?
Yes. We serve Al Matar (near An Nabiyah) and nearby areas such as Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Do the kitchen tiles have to be lifted to waterproof it?
If tiles are already down and the leak is under them, lifting the tiles is the better path to reach the surface and lay a proper waterproof layer before new tiles go on. If the surface is already open during renovation, waterproofing goes on before the tiles. Send photos on WhatsApp and we will advise for your situation.
What decides the cost of kitchen waterproofing?
The floor area, the surface condition and how much crack treatment or levelling it needs, the type of waterproof material that suits the surface, whether tiles must be lifted or the surface is already open, and how easily the site can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.
The same service in nearby areas
Nearby areas we also cover: Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan.
More services in Al Matar (near An Nabiyah)



