Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Industrial Arifi

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Industrial Arifi

We waterproof washrooms in the Arifi Industrial Area, Hofuf, beginning with photos of the floor, wall bases and drain openings that you send by call or WhatsApp. Work can be carried out at the build stage or after tiling.

The Industrial Arifi area holds warehouses, workshops and service facilities, where washrooms see heavy use and water can spread from their floors. Lower walls take repeated wetting, and larger floors crack at their joints. Photos establish where water is escaping before a method is chosen.

  • The Arifi Industrial Area is an industrial zone in Hofuf, Al-Ahsa, in the Eastern Province, lying close to Al Yarmuk.
  • Heavy use in commercial washrooms means their joints get wet far more often than in household bathrooms.
What the service includes

What the service covers in Industrial Arifi

  • Cleaning the surface and treating hairline cracks and pipe entries
  • Closing the drain opening ring and the bathroom door threshold
  • Checking the floor, wall bases, corners and the drain opening
  • Leaving the layer to cure before any finish goes over it
How we work

From first contact to the finished job in Industrial Arifi

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Industrial Arifi is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Industrial Arifi comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Industrial Arifi

Do you waterproof washrooms in industrial premises?

Yes, we serve the Arifi Industrial Area. Send photos of the washroom, its floor and drain openings so we can understand the work required.

Does waterproofing differ in premises from homes?

It can differ in area size and in how hard the space is used, so the material and method are chosen after the photos are reviewed and the condition explained before work starts.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Do you offer bathroom waterproofing in Industrial Arifi?

Yes. Industrial Arifi is within our service area in the Eastern Province, and we also work in Al Yarmuk (near Ghizlan), Al Tawyah and Al Dabab (near Ghizlan). Call us or send photos of the spot on WhatsApp.

Nearby areas

The same service in nearby areas

We also offer bathroom waterproofing in Al Yarmuk (near Ghizlan), Al Tawyah and Al Dabab (near Ghizlan), among the closest areas to Industrial Arifi.

Other services in the area

More services in Industrial Arifi

Two workers on the roof insulating around an AC unit

Tell us about your site in Industrial Arifi
and we will plan the next step with you

Describe the problem and where it is in Industrial Arifi, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp