Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Ettisalat

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Ettisalat

Bathroom waterproofing in Ettisalat begins with photos of the floor, wall bases and drain openings, sent by call or WhatsApp. The district is residential, with houses, villas and flats, and the method depends on whether the bathroom is under construction or already tiled.

Buildings in Ettisalat range from detached villas and linked houses to flats, and many have several bathrooms on one floor. In tiled bathrooms, damp often gathers where the floor meets the drain and along walls beside the shower, and a stain may appear on a ceiling below without any visible fault above the tiles. The photos pinpoint the source before any work begins.

  • Ettisalat is a residential district of Dammam in the Eastern Province, close to Ar Rayyan, Ghirnatah and Ibn Khaldun.
  • A damp stain on a lower ceiling often appears well away from the actual leak above the tiles.
What the service includes

The bathroom waterproofing work in Ettisalat

  • Applying a continuous waterproof layer rising at walls and corners
  • Leaving the layer to cure before any finish goes over it
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Checking the floor, wall bases, corners and the drain opening
How we work

The stages of the work in Ettisalat

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

We serve Ettisalat and around itIncluding Ar Rayyan (near Dammam), Ghirnatah (near Dammam) and Ibn Khaldun, as part of our work across the Eastern Province.

Ettisalat is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing in Ettisalat

Why does damp show on the ceiling below in the district?

Water often travels through the floor and joints to the ceiling beneath the bathroom, so the stain appears away from the leak point. Send photos of the ceiling and the floor above so we can locate the source.

Do you treat bathrooms in both villas and flats in the district?

Yes, we work on both villas and flats in Ettisalat. Mention the building type and floor in your message so we can tell whether the work stays inside the bathroom or needs access to other parts.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Is Ettisalat within your service area?

Yes, Ettisalat is one of the areas we work in, as are Ar Rayyan (near Dammam), Ghirnatah (near Dammam) and Ibn Khaldun. To start, call us or message us on WhatsApp.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Nearby areas

Areas near Ettisalat

If the site is outside Ettisalat, the same service is available in Ar Rayyan (near Dammam), Ghirnatah (near Dammam) and Ibn Khaldun.

Other services in the area

More services in Ettisalat

Two workers on the roof insulating around an AC unit

In Ettisalat and need bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Ettisalat, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp