Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Umm Ishar

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Umm Ishar

Bitumen bathroom waterproofing in Umm Ishar begins with WhatsApp photos of the floor and walls. The village consists of scattered houses and villas on wide plots, and the bathroom needs protection before screed and tiling.

Umm Ishar has houses and villas spread across wide plots, and bathrooms here are of varying sizes and designs. The floor and walls of a newly built bathroom need a tight bitumen layer before screed and tiling to stop water seeping through. Moisture from rare rain and daily use makes this waterproofing necessary to protect the structure. Photos show the surface condition and help us choose the right method for a village like Umm Ishar.

  • Umm Ishar is a village in the Eastern Province, close to Samudah, An Nayfiyah and King Khālid Military City.
  • A new bathroom needs bitumen waterproofing before any other layer, because water penetrates concrete easily without a barrier.
What the service includes

What we do for you in Umm Ishar

  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The steps of bitumen bathroom waterproofing in Umm Ishar

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from Umm Ishar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Umm Ishar is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Umm Ishar

Is bitumen alone enough for a bathroom in Umm Ishar?

Bitumen forms the main water barrier, but screed and tiling after it provide extra protection and a usable surface. Photos show if there are further needs depending on the floor and wall condition.

How do you handle bathroom moisture in villages like Umm Ishar?

We waterproof the floor and walls with bitumen before completion, which stops water entering the concrete and causing lasting damp. Send us photos and we will tell you the right approach.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you cover Umm Ishar?

Yes. We serve Umm Ishar and nearby areas such as Samudah, An Nayfiyah (near King Khālid Military City) and King Khālid Military City, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Umm Ishar

Nearby areas we also cover: Samudah, An Nayfiyah (near King Khālid Military City) and King Khālid Military City.

Other services in the area

More services in Umm Ishar

Pool at night with water jets after waterproofing

Tell us about your site in Umm Ishar
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp