Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Umm Ishar

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Umm Ishar

Bathroom waterproofing before tiling in Umm Ishar starts with a photo of the space sent by WhatsApp or call. The village has varying houses and villas, with bathrooms that differ in age and condition, each needing to be checked from photos before work begins.

Umm Ishar has houses and villas of different sizes and ages, and its bathrooms reflect that variety. Some bathrooms in older homes need full refurbishment, while newer ones may only need updated waterproofing. The region's humidity and hot desert climate set specific demands on the material. Photos help determine the state of walls and floors and the right treatment.

  • Umm Ishar is a village in the Eastern Province, close to Samudah, An Nayfiyah and King Khālid Military City, with houses and villas of varying sizes.
  • A bathroom in an older house often needs base repairs before new waterproofing is applied.
What the service includes

The scope of the work in Umm Ishar

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

This is how we work in Umm Ishar

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Umm Ishar is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Umm Ishar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Umm Ishar

What is the difference between waterproofing a bathroom in an old house and a new one in Umm Ishar?

An old house may need base repairs first, while a new one may only need the waterproofing applied. Photos show the difference and help us plan the steps.

Does the arid environment in Umm Ishar affect the choice of waterproofing material?

Yes, intense heat and dryness affect materials, but inside the bathroom, moisture from use is the main source. We choose material that withstands both together.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Is Umm Ishar within your service area?

Yes, Umm Ishar is one of the areas we work in, as are Samudah, An Nayfiyah (near King Khālid Military City) and King Khālid Military City. To start, call us or message us on WhatsApp.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

Areas near Umm Ishar

We also work near Umm Ishar, in Samudah, An Nayfiyah (near King Khālid Military City) and King Khālid Military City.

Other services in the area

More services in Umm Ishar

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Umm Ishar
with one call

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp