Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Sinaiyah Ath Thuqbah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Sinaiyah Ath Thuqbah

Bitumen bathroom waterproofing in Sinaiyah Ath Thuqbah starts with photos of the floor and lower walls, sent by call or WhatsApp. The district mixes industrial and residential buildings, where bathrooms need protection before tiling and screeding.

Sinaiyah Ath Thuqbah holds industrial units, residential buildings and small commercial compounds. Its bathrooms vary in age and design, some newly built and others needing updating. Bitumen shields the concrete and lower wall sections from damp and water before finishing. Photos show the surface condition and any cracks or weak points that need prior treatment.

  • Sinaiyah Ath Thuqbah is a district in the Eastern Province, close to Al Iskan, Ibn Sina and As Sahil, with industrial units and residential buildings.
  • A bathroom with both water supply and drain pipes needs strong waterproofing at the floor, corners and pipe entries.
What the service includes

The scope of the work in Sinaiyah Ath Thuqbah

  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
  • Confirming full drying before the screed is poured
How we work

The stages of the work in Sinaiyah Ath Thuqbah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Your request from Sinaiyah Ath Thuqbah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bitumen bathroom waterproofing in Sinaiyah Ath ThuqbahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Sinaiyah Ath Thuqbah

How thick should the bitumen layer be in a bathroom?

The thickness depends on the concrete surface condition and existing moisture. Photos help us decide what suits your bathroom, as the approach varies with conditions.

Does bitumen protect from water leaks after tiling?

Bitumen creates a water barrier at the foundation stage before finishing. Complete protection requires correct application to floors, lower walls, corners and joints. Photos and inspection determine what your bathroom needs.

Do you cover Sinaiyah Ath Thuqbah?

Yes. We serve Sinaiyah Ath Thuqbah and nearby areas such as Al Iskan (near Al Khobar), Ibn Sina and As Sahil (near Al Khobar), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

Bitumen bathroom waterproofing near Sinaiyah Ath Thuqbah

We also work near Sinaiyah Ath Thuqbah, in Al Iskan (near Al Khobar), Ibn Sina and As Sahil (near Al Khobar).

Other services in the area

More services in Sinaiyah Ath Thuqbah

Pool at night with water jets after waterproofing

Your first step in Sinaiyah Ath Thuqbah:
a call or a WhatsApp message

Describe the problem and where it is in Sinaiyah Ath Thuqbah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp